Reference no: EM13326759
Zeller Company uses standard costing. The company has two manufacturing plants, one in Nevada and the other in Ohio. For the Nevada plant, Zeller has budgeted annual output of 4,000,000 units. Standard labor hours per unit are 0.25, and the variable overhead rate for the Nevada plant is $3.25 per direct labor hour. Fixed overhead for the Nevada plant is budgeted at $2,500,000 for the year. For the Ohio plant, Zeller has budgeted annual output of 4,200,000 units with standard labor hours also 0.25 per unit. However, the variable overhead rate for the Ohio plant is $3 per hour, and the budgeted fixed overhead for the year is only $2,310,000. Firm management has always used variance analysis as a performance measure for the two plants, and has compared the results of the two plants. Jack Jones has just been hired as a new controller for Zeller. Jack is good friends with the Ohio plant manager and wants him to get a favorable review. Jack suggests allocating the firm's budgeted common fixed costs of $3,150,000 to the two plants, but on the basis of one-third to the Ohio plant and two-thirds to the Nevada plant. His explanation for this allocation base is that Nevada is a more expensive state than Ohio. At the end of the year, the Nevada plant reported the following actual results: output of 3,900,000 using 1,014,000 labor hours in total, at a cost of $3,244,800 in variable overhead and $2,520,000 in fixed overhead. Actual results for the Ohio plant are an output of 4,350,000 units using 1,218,000 labor hours with a variable cost of $3,775,800 and fixed overhead cost of $2,400,000. The actual common fixed costs for the year were $3,126,000.
Required
1. Compute the budgeted fixed cost per labor hour for the fixed overhead separately for each plant:
a. Excluding allocated common fixed costs
b. Including allocated common fixed costs
2. Compute the variable overhead spending variance and the variable overhead efficiency variance separately for each plant.
3. Compute the fixed overhead spending and volume variances for each plant:
a. Excluding allocated common fixed costs
b. Including allocated common fixed costs
4. Did Jack Jones's attempt to make the Ohio plant look better than the Nevada plant by allocating common fixed costs work? Why or why not?
5. Should common fixed costs be allocated in general when variances are used as performance measures? Why or why not?
6. What do you think of Jack Jones's behavior overall?
What is the potential at the initial point
: External work equal to 4x10-7 J is needed to move a -5 nC charge at constant speed to a point at which the potential is - 20 V. What is the potential at the initial point
|
How much work was done on the book
: A 1.55kg book is sliding along a rough horizontal surface. At point A it is moving at 3.31m/s , and at point B it has slowed to 1.41m/s. How much work was done on the book between A and B
|
How many copies of the transposable elements a and b
: Suppose that you transform a different strain of yeast (which does not contain these types of transposable elements) with each of the newly discovered transposable elements. You let each of the elements transpose one time.
|
Find the angular frequency of the charged particle
: A charged particle of mass m and charge +q is placed in the vertical electrical field E(x)= A-Cx, Find expression describing the angular frequency of the charged particle oscillations
|
Compute the budgeted fixed cost per labor
: Compute the budgeted fixed cost per labor hour for the fixed overhead separately for each plant and compute the variable overhead spending variance and the variable overhead efficiency variance separately for each plant.
|
Determine her speed at the start of the slide
: A cross-country skier slides horizontally along the snow and comes to rest after sliding a distance of 28 m. determine her speed at the start of the slide
|
How much energy does this involve
: A lightning flash may transfer up to 30 C of charge through a potential difference of 10^8 V. How much energy does this involve
|
Design an relational model
: Choose 2 enterprises(businesses, corporations, companies, institutions) from one or more economic, organizational, institutional or industrial sector of interest to you. See the Appendix for suggestions and examples.
|
What is the magnitude and direction of the velocity
: in its daily prow of the neighborhood a cat makes a displacement of 100m due north followed by an 80m displacement east. what is the magnitude and direction of the velocity
|