The Field data and the fixed data follow for each of six traverses. The forward direction is given by the alphabeteical order of the station names. Each angle is measured clockwise from the back direction to the forward direction so that  they are on the left of the traverse looking forward.

Draw a sketch, compute the accuracy, and compute the final coordinates. Adjust by the compass rule.

Station      Traverse Angle                          Length, ft

A             91 degrees 18 minutes           AB 554.09

B            94 degrees 28 minutes           BC 425.31

C             109 degrees 28 minutes        CD 426.05

D            102 degrees 26 minutes       DE 345.28

E            142 degrees 06 minutes        EA 322.21

Bearing BC: S 3 degrees 11 minutes E

Coordinates B: N 1000.00, E 1000.00

Reference no: EM13563630

Questions Cloud

What is the distribution of the number of systems that : A hydrologic structure (e.g. a dam or a dike) is said to be designed for the N-year flood if it has a capacity which will be exceeded only by a flood equal oto or greater than N-year flood. The magnitude of the N-year flood is that which is exceeded ..
What is the outlet concentration after the treatment : A completely mixed retention basin is used to treat an industrial waste water consisting of a non-conservative pollutant, using a reaction that destroys the pollutant according to first-order reaction kinetics, with k = 0.216/day
What percent change in frequency results : Air Friction damps a tuning fork so that the amplitudedecreases by (1/8.1) per second. Resonance= 74 Hertz. What percent change in frequency results
What is the retention time for this lake : A small lake with volume of 20,000 m^3 has no natural pollutant sources. However, a sewage pipe discharges sewage containing an organic polluntant into the lake. Conditions in the sewage pipe are Qs= 0.5 m^3/s, and Cs= 100mg/L.
Compute the accuracy and compute the final coordinates : The Field data and the fixed data follow for each of six traverses. The forward direction is given by the alphabeteical order of the station names. Each angle is measured clockwise from the back direction to the forward direction so that  they are on..
What is the approximate diameter of an oil molecule : Given an oildroplet with a mass of 7.59e-7 kg and a density of 952 kg/m^3 that spreads out to form a circle with a radius of 42.2 cm on the water surface, what is the approximate diameter of an oil molecule
Calculate the work done by an external agent : Calculate the work done by an external agent during anisothermal compression of 1.00 mol of oxygen from a volume of24.0 L at 0°C and 1.00 atmpressure to 17.5 L
Determine the concentration of the pit''s overflow stream : A company has been discharging its waste into a holding pit for a long time. For the last several years, the pit has been full and overflowing into a local river. The waste concentration has been nearly constant at 10 mg/L of the pollutant of interes..
What would be the resistance on a level road : An automobile has been designed to maintain a constant speed of 55 mph on a +5% grade. The weight of the vehicle when fully loaded is 6000 lbs. What is the total resistance in still air of this vehicle? What would be the resistance on a level road?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Calculate the mass emissions rate of ash into the atmosphere

The coal has an ash content of 12% by mass. Forty percent of the ash falls out the bottom of the furnace. The rest of the ash is carried out of the furnace with the hot gases into an electrostatic precipitator (ESP).

  Estimate amount of lime required for specified ferric dose

estimate the mass and volume of sludge produced from unreated wastewater without and with the use of ferric chloride for the enhanced removal of TSS. Also, estimate the amount of lime required for the specified ferric schloride dose.

  Determine effective annual interest rate for a nominal rate

Determine the effective annual interest rate for a nominal rate of 8% per year, in which is compounded quarterly.

  What types of quality management tools

What are two or three quality management tools used in data collection? What types of quality management tools do you utilize to make personal or business decisions? How do you use these tools in the decision-making process?

  Find length of pipe needed to bring water to saturated vapor

Saturated liquid water at 1000 kPa flows at 2 kg/s inside a 10 cm outer diameter steel pipe and outside of the pipe is a flow of hot gases at 1000 K with a convection coefficient of h = 150 W/m2 K.

  What mass of pac must be placed in a contact basin

If the toluene concentration in the water supply is 1,000 ppb, the treatment objective is 5 ppb, and the flow of water is 378 L/min (100 gpm), what mass of PAC must be placed in a contact basin on a daily basis to satisfy the treatment objective

  What is the concentration of mlvss in the activated sludge

What is the concentration of MLVSS in the activated sludge (mg L-1)

  Compute the elastic modulus and the shear modulus

a cylindrical specimen of a metal alloyed in stressed in compression. If its original and final diameters are 40.00 and 40.10 mm, respectively , and its final length is 120.00 mm, compute its original length(L0)

  When the pressure drops across the basket strainer

Abasket strainer is installed in a 15-cm diameter pipe. Pressuregauges are installed immediately upstream and downstream of thebasket strainer. When water flows at 100 m3/hr, the pressure gaugeimmediately upstream of the basket strainer measures 1 ba..

  Calculate the acceleration in meters per second squared and

Calculate the acceleration in meters per secondsquared and compare to the value of the gravitational accelerationnear the Earth's surface (9.8 m/s^2)

  What would the weir coefficient be

If a source of groundwater gets contaminated with a DNAPL and another one gets contaminated with a LNAPL, which one will be harder to remediate and why ?

  Determine the magnitude of force f2 and the angle

Two ropes are attached to the eye bracket. The resultant force R of the two forces equals 1000-lb and the line of action is directed along the x-axis. if the magnitude of force F1 is 250-lb, determine the magnitude of force F2 and the angle

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd