Question - A 65 km urban highway is planned to be constructed to connect a Kajang to Port Klang. Estimated cost is RM 2,000 million and the construction period is planned to be 2 years. The highway project will be privatised and the concession period is 10 years.
The concession company will finance RM 200 million of the total cost using its own source and the balance will be financed by a local bank. Financing period is 10 years and yearly repayment is RM 300 million for 8 years after the construction period.
Maintenance cost is estimated to be RM 50 million a year and expected to be increasing at 7% per annum. Toll collection is estimated to be RM 390 million a year and increasing at 9% per annum.
Required -
(a) Compute NPV cost and NPV income for the concession period. Use 8% discount rate.
(b) Compute Benefit Cost Ratio.
(c) Prepare computation table as in (a) with 42% discount rate or cost stream table.
(d) Compute Internal Rate of Return (IRR).
Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest. How much control does the Fed have over this longer real rate?
Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.
Accounting problems, Draw a detailed timeline incorporating the dividends, calculate the exact Payback Period b) the discounted Payback Period. the IRR, the NPV, the Profitability Index.
Term Structure of Interest Rates
Write a report on Internal Controls
Prepare the bank reconciliation for company.
Create a cost-benefit analysis to evaluate the project
Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR
Distinguish between liquidity and profitability.
Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.
Simple Interest, Compound interest, discount rate, force of interest, AV, PV
CAPM and Venture Capital
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd