Reference no: EM13547381
Compute and interpret price and usage variances for material, labour, and overhead inputs
Scenario
5K Ltd. makes and sells a single product "JAY" standard costs relating to "JAY" have been calculated as follows:
Per unit($)
Direct material:
X : 4 Kg at $12 per kg
Direct labour, 5 Hours at $7 per hour
Variable production Overhead, 5 Hours at $2 per hour Fixed production Overhead 5 hours at $10 per hour
|
48.00 35.00 10.00 50.00 143.00
|
|
|
Overhead is absorbed into production on the basis of standard hours of production and budaeted volume of production is 20.000 units.
The budgeted selling price of LAN is $150.
For the period under consideration the actual results were :
18,000 units were produced out of which 17,000 were sold for $2,618,000. Relevant details of production are as follows:
Materials 76,000 Kg's costing $ 836,000 Labour 84,000 hours were paid $604,800 Variable production overhead was $172,000 Fixed production overhead was $1,030,000
Using the above data:
Compute and Interpret price and usage variances for material, labour, overhead (fixed and variable) and sales.
Estimate the balls speed at the bottom of the ramp
: A 1.10m long ramp is inclined at 13 degrees to the horizontal. A solid ball is released from rest at the top of the ramp. Find the ball's speed at the bottom of the ramp
|
Find the wavelength of the waves on the string
: One end of a string 3.0 m long is moved up and down with simple harmonic motion at a frequency of 60 Hz. The waves reach the other end of the string in 1.00 s. Find the wavelength of the waves on the string.
|
Determine how long does this process take
: A wheel 55.0 cm in diameter accelerates uniformly from 215 rpm to 370 rpm. how long does this process take
|
Explain the absolute and percent relative uncertainty
: Find the absolute and percent relative uncertainty and express the answer with a reasonable number of significant figures for the following calculation
|
Compute and interpret price and usage variances
: Compute and Interpret price and usage variances for material, labour, overhead (fixed and variable) and sales.
|
How much kinetic energy does the squid create
: Squids and octopuses propel themselves by expelling water. They do this by taking the water into a cavity and then suddenly contracting the cavity, How much kinetic energy does the squid create for this escape maneuver
|
What is the persons velocity at this point
: A person doing a chin-up weighs 680 N exclusive of the arms. During the first 25.0 cm of the lift, what is the person's velocity at this point
|
An old fashion record is spinning freely
: An old fashion record is spinning freely at 78 rpm (revolutions per minute) when another record is dropped (lightly) vertically on it. Now there are two records turning together at 39 rpm, because a. rotational energy is conserved b. vertical motion ..
|
Explain impurity of cu2+ in the water
: what is the concentration (in mole/L or M) of Cu2+ and NO3- in the final solution. Remember your significant figures. If there is an impurity of Cu2+ in the water you are using to perform the dilutions, what type of error is this associated with t..
|