Compute all manufacturing overhead variances for layt

Assignment Help Managerial Accounting
Reference no: EM13519120

Layt Clock Company has developed the following flexible budget for its overhead costs. Manufacturing overhead at Layt is applied to production on the basis of standard machine-hours:


Machine Hours


21,600

24,000

26,400

Clocks produced

18,000

20,000

22,000

Variable overhead cost

$127,440

$141,600

$155,760

Fixed overhead cost

$171,072

$171,072

$171,072

Layt was expecting to produce 22,000 clocks last year. The actual results for the year were as follows:

Number of clocks produced

21,500

Machine-hours incurred

24,940

Variable overhead cost

$145,899

Fixed overhead cost

$170,540

Required:

Compute all four manufacturing overhead variances for Layt.

Reference no: EM13519120

Questions Cloud

What was the variable overhead spending variance : What is the denominator level of activity, what were the standard hours allowed for the output last year and what was the variable overhead spending variance?
What circumstances must one break the law : Under what circumstances must one break the law? How does Thoreau's essay relate to the Mexican-American war?
Explain the value of kp at the same temperature : Phosphorus pentachloride decomposes to phosphorus trichloride and chlorine gas at elevated temperatures by the following reaction: PCl5(g) PCl3(g) + Cl2(g). If Kc = 1.8 at 250°C, what is the value of Kp at the same temperature
What is humes major claim about morality : What is Hume's major claim about morality? How does he defend his claim? What criticisms can be given of his arguement and/or his claim?
Compute all manufacturing overhead variances for layt : Compute all manufacturing overhead variances for Layt - Manufacturing overhead at Layt is applied to production on the basis of standard machine-hours
Find how much mass was converted into energy in bomb : "Fat Man," the atomic bomb dropped on Nagasaki at the end of World War II released approximately 88 x 10^12 J of explosive energy. How much mass was converted into energy in this bomb
Explain water to make an ideal solution : What mass (in grams) of methanol (CH3OH) would need to be added to 250 grams of water to make an ideal solution with a boiling point of 104.3°C? (Kb for water is 0.512°C/m)
How well costs were controlled in department : Prepare a report that would be useful in assessing how well costs were controlled in this department.
Calculate the energy lost by the pendulum : The coil wand pendulum starts swinging with an angle of 30 degrees with the vertical. After it passes through the magnetic gap, the pendulum rises to a level which makes 10 degrees with the vertical. What is the energy lost by the pendulum

Reviews

Write a Review

Managerial Accounting Questions & Answers

  Manage budgets and financial plans

Explain the budgeting process and its importance to a business, identifying the components of different budgets, forecast estimates for inclusion in the budgets.

  Prepare a retained earnings statement

Prepare a retained earnings statement for the year and Prepare a stockholders' equity section of given case.

  Prepare a master budget for the three-month period

Prepare a master budget for the three-month period.

  Construct the companys direct labor budget

Construct the company's direct labor budget for the upcoming fiscal year, assuming that the direct labor workforce is adjusted each quarter to match the number of hours required to produce the forecasted number of units produced.

  Evaluate the predetermined overhead rate

Evaluate the Predetermined Overhead Rate

  Determine the company''s bid

Determine the company's bid if activity-based costing is used and the bid is based upon full manufacturing cost plus 30 percent.

  Compute the pool rates for the different activities

Complete the schedule to compute the pool rates for the different activities.

  Prepare Company financial statements

Prepare Company financial statements

  Prepare an analysis of terracycles

This individual assignment is based on the TerraCycle Inc.

  Discuss the ethical issues

Discuss the ethical issues

  Political resources in emerging markets

Calculate the GDP in Income Approach  and Expenditure Approach

  Management accounting - ehsan electronics company

A new plant accountant suggested that the company may be able to assign support costs to products more accurately by using an activity based costing system that relies on a separate rate for each manufacturing activity that causes support costs.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd