Reference no: EM133128315
Question - Building a kayak using the composite method is a very labour-intensive process. In the fabrication department, the kayaks go through several steps as employees carefully place layers of Kevlar® in a mould and then use resin to fuse together the layers. The excess resin is removed with a vacuum process, and the upper shell and lower shell are removed from the moulds and assembled.
The seat, hatch, and other components are added in the finishing department.
At the beginning of April, Current Designs had 29 kayaks in process in the fabrication department. Rick Thrune, the production manager, estimated that about 80% of the material costs had been added to these boats, which were about 50% complete with respect to the conversion costs. The cost of this inventory had been calculated to be $8,450 in materials and $8,180 in conversion costs.
During April, 78 boats were started into production. At the end of the month, the 35 kayaks in the ending inventory were 20% complete as to materials and 40% complete as to conversion costs.
A review of the accounting records for April showed that materials with a cost of $17,620 had been requisitioned by this department and that the conversion costs for the month were $44,280.
Complete a production cost report for April 2022 for the fabrication department using the weighted-average method. Direct materials and conversion costs are incurred uniformly throughout the process.
How much interest would billy have to pay in a month
: Billy Thornton borrowed $185,000 at a rate of 7.25%, simple interest, with interest paid at the end of each month. How much interest would Billy have to pay
|
Classification essay assignment
: Classification Essay Assignment - identify its classifications and provide enough evidence to prove that your classifications are correct
|
Charge different prices for the parcel and package service
: Seven years ago, you started a crosstown delivery service. The service is an environmentally friendly business and, given all the traffic congestion, you are al
|
Potential choice of research topic and research design
: Before the end of this course, you will complete CITI training to foster your professional development and integrity as a researcher. What will you learn in CIT
|
Complete a production cost report for april
: Complete a production cost report for April 2022 for the fabrication department using the weighted-average method
|
Construct a suitably labeled demand and supply diagram
: Using the demand and supply figures in Table 1 below, construct a suitably labeled demand and supply diagram, and clearly identify the equilibrium price and qua
|
How much is the nci at the end
: P Corporation, an SME, paid P3,000,000 for a 90% interest in S Company on January 1, 2019. How much is the NCI at the end of 2019
|
Demonstrate trustworthiness of the data
: Based on the sources of data identified in the first discussion question in this topic, how would the researcher demonstrate trustworthiness of the data to addr
|
Maximize the likelihood that your team exerts
: Assume you are a manager in a business (or on a team) where effort is difficult to monitor. Which mechanism would you implement in order to maximize the likelih
|