Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Pacchiana Manufacturing Corporation has a traditional costing system in which it applies manufacturing overhead to its products using a predetermined overhead rate based on direct labor-hours (DLHs). The company has two products, R21V and D00B, about which it has provided the following data:
R21V
D00B
Direct materials per unit.................
$19.60
$61.70
Direct labor per unit.......................
$3.90
$19.50
Direct labor-hours per unit.............
0.30
1.50
Annual production.........................
45,000
15,000
The company's estimated total manufacturing overhead for the year is $1,262,880 and the company's estimated total direct labor-hours for the year is 36,000.
The company is considering using a variation of activity-based costing to determine its unit product costs for external reports. Data for this proposed activity-based costing system appear below:
Activities and Activity Measures
Estimated Overhead Cost
Assembling products (DLHs)....................
$ 108,000
Preparing batches (batches).......................
362,880
Product support (product variations).........
792,000
Total...........................................................
$1,262,880
Expected Activity
Total
DLHs........................
13,500
22,500
36,000
Batches.....................
1,440
1,152
2,592
Product variations.....
1,404
576
1,980
1. The unit product cost of product R21V under the company's traditional costing system is closest to:
A) $34.02
B) $24.40
C) $41.36
D) $23.50
2. The unit product cost of product D00B under the activity-based costing system is closest to:
A) $111.81
B) $133.82
C) $81.20
D) $30.61
Design a dimensional model for analysing Purchases for Adventure Works Cycles and implement it as cubes using SQL Server Analysis Services. The AdventureWorks OLTP sample database is the data source for you BI analysis.
Design a Database schema
Create an entity-relationship diagram and design accompanying table layout using sound relational modeling practices and concepts.
Implement a database of courses and students for a school.
Energy in the home, personal energy use and home energy efficiency and Efficient use of ‘waste' heat and renewable heat sources
Design relation schemas for the entire database.
Prepare the relational schema for database
Data Modeling and Normalization
Use Cases Perform a requirements analysis for the Case Study
Knowledge and Data Warehousing
Identify and explain the differences between a stack and a queue data structure
Practice on topic of Normalization
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd