Case. Communication Problems at Ozark Corporation

March is the busiest time of the year at Ozark Corporation. Thus, when the production line in Section A has trouble for the second time in a week, Sam Case decides he’d better get it straightened out immediately. As the lead supervisor, Sam is directly in charge of Sections A and B.

Sam calls in Paul Banks, the new supervisor in Section A. Their conversation is as follows:

Sam:Paul, we seem to be having some problems in your section. The line has been down twice in the last three days. This is our busiest time of the year. We can’t afford to have recurring problems of this type. I want you to stop that quality-control project I have you working on, find out what the problem is out on the line, and get rid of it.

Paul:Okay, I’ll get out there, find out what’s causing the problem, and get rid of it.

Sam:Fine.

A quick check of the line reveals that there was a problem with the automatic control unit. Paul checks and finds that it would take four hours to replace the unit. "If you put in a new one," the maintenance man tells him, "you won’t have a problem with it for at least sixteen months. It’s up to you. I’ll do whatever you tell me." Paul tells the man to replace the automatic control unit.

By late afternoon the new unit is installed and the line is operating at full speed. However, the next morning, after Sam receives the previous day’s production figures, he calls Paul in. "What happened in your section? I thought you were going to fix the problem."

"I did," Paul tells him. "The automatic control unit was giving us trouble, so I replaced it."

Sam’s voice indicates that he is not happy with this decision. "You pulled the unit in the middle of a workday? Why didn’t you wait until the shift was over and have the unit pulled then? You could have done preventive maintenance to get through the rest of the day. You gave up two hours of production time to replace a unit that could have waited for maintenance."

Paul is shocked. He thought he had done the right thing. "Look, Sam," he says, "you told me to get rid of the problem and I did. You didn’t say anything about preventive maintenance or not stopping the line."

Sam realizes that the discussion is beginning to get out of hand. "Look, let’s stand back and quietly discuss this matter." With that, the two men start discussing the matter from the beginning.

1. Analyze the communication between the lead supervisor, Sam Case, and the new supervisor in Section A, Paul Banks. What did Sam do wrong?

2. How could the problem have been prevented? In your answer discuss the requirement for active listening.

3. Discuss the barriers to effective communication. What should Sam and Paul learn from this experience that will make them better communicators and more effective supervisors.

Reference no: EM132106686

Questions Cloud

Describe the components of employee selection process : Describe the components of an employee selection process. Determine the differences between manufacturing and service operations?
What is their importance to the culture of children : What conclusions can you draw about the two types of fiction you chose? What is their importance to the culture of children?
Balanced scorecard approach to evaluate : Use the balanced scorecard approach to evaluate and/or help formulate strategy.
Analysis of the specific healthcare system : For this assignment, conduct a thorough analysis of the healthcare system within Saudi Arabia. Specifically, focus on the development and implementation.
Communication problems at ozark corporation : Analyze the communication between the lead supervisor, Sam Case, and the new supervisor in Section A, Paul Banks.
Define pros and cons to pay for performance : In this discussion, highlight the pros and cons to pay for performance as a cost saving technique. Additionally, summarize recent studies to determine.
Describe what is meant by holistic health : Describe what is meant by Holistic Health supporting your description with a professional resource
What is the fully loaded cost of labor : How has the global economy affected the importance of cost estimation and cost control for many project organizations?
Calculate annual cost for firm whose demand forecast : Develop a production plan and calculate the annual cost for a firm whose demand forecast is fall, 10,000; winter, 8,000;

Reviews

Write a Review

Operation Management Questions & Answers

  Scholarships office that you would receive

You have just notified by the Student Aid and Scholarships Office that you would receive a regent's scholarship of $2000 for the coming academic year.

  Engage in diversification

what would have happened to Gore if it did NOT engage in diversification?

  Working on a physical board game

We are doing a project and working on a physical board game for CPA test takers. And the Opportunities we found are: 1> Targeted game for CPA prep Individualized Learning;2> Create an application version;3> Make game exciting to change students perce..

  Briefly provide an introduction to the management topic

Briefly provide an introduction to the management topic, trend, or issue you selected. Identify the theory (or theories) that underlies or drives the topic, trend, or issue you selected. Explain how this theory (or these theories) help explain the..

  Contract to protect his brand from being ambushed

Dave Canin is the digital marketing manager for a major cell phone company. The company has decided to sponsor the NCAA Men's basketball tournament. Dave is currently in negotiation with the NCAA about the terms of the agreement. What should Dave neg..

  What is a strategic group

What is a strategic group? How can studying such groups be useful in industry analysis?

  Longest planning horizon and the least level of detail

Which of the following plans has the longest planning horizon and the least level of detail?

  The conclusion can be questioned

In a causal argument, the conclusion can be questioned because it is the claim at issue. But in an explanation, the claim being explained is assumed to be true.

  Critical path method to identify the critical path

The CPM (Critical Path Method) is a method to identify the critical path, which:

  Repeatedly failing to meet performance targets

you were about to fire him for repeatedly failing to meet performance targets - just emailed you from his new job, requesting a recommendation.

  Designing for the customer-quality function deployment

The four basic design criteria are -Designing for the customer-Quality Function Deployment-Value Analysis/Value Engineering.

  Framework groups forces in firm general environment

A PESTEL framework groups forces in a firm's general environment in one of six factors.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd