Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
During the recent camping trip, a curious junior engineering student (like yourself) noticed that water is being discharged from a high reservoir to a stream in the valley through a 0.3 m diameter plastic pipe. The difference in elevation between the free surface of the reservoir and the stream is about 70 m. This junior engineer envisions that this could serve as a source of hydro-electric power.
Generate suitable design information to produce maximum power from this site. In addition, assess the effect of power generation on the discharge rate of water to mimick the potential seasonal variation of water available in the reservoir. Comment on the water discharge rate for maximum power generation.
The buses are run by independent drivers, however, who make no attempt to coordinate their schedules. Actually, one bus runs slightly faster than the other so that over many trips the fraction of trips that the second bus leaves within a time t
Two toll booths are open and each can process arrivals (collect tolls) at a mean rate of 12 seconds per vehicle ( the processing time is also exponentially distributed). What is the total time spent in the system by all vehicles in a 1 hour period
Suppose 2.3 g/day of vinyl chloride, with a half-life of 1 day, leaks into a 20,000 m3 pond. Suppose an adult obtains his drinking water from the pond and consumes the water daily for 7 years
Calculate the minimum-sized sand particle that would be removed in the chamber. To be removed, the particles must settle the depth of 2 m during the period the wastewater spends in the chamber (dT=V/Q).
What is the total deformation in a 15' 2'' square steel hanger that supports a 36000 pound load
Two identical pool balls of 57.15 mm diameter may move freely on a pool table. Ball B is at rest and ball A has an initial velocity v=v0i. (a) knowing that b=50 mm and e=0.7, determine the velocity of each ball after impact.
assume lateral support at each support and every 20 ft between supports. assume constant depth for girder. use A 572 grade 50steel. use LRFD methods. minimum web thickness is 5/16 inches.
A discharge from a power plant cooling tower has a temperature of 81 degrees C and flows into the stream at a rate of 3 cubic meters per minute. What is the temperature in the stream downstream of the cooling tower discharge
Define what each term in the equation means. Overall, what quantity is being conserved? Under what conditions might you be justified in assuming that non-linear terms are not important
A solid steel shaft of circular cross section and diameter 6 inches in pure torsion under torque. If E=30x10^6 pse and max shear stress is 30 ksi, calculate the torque. If the shaft was hollow, with an innner diameter of 2 inches and outer diameter..
How many pounds of concrete (γ=150 lb/ft3) must be attached to a beam having a volume of 4.0 ft3(s.g.=0.65) to cause both to sink?
We are digging a hole to build a building. Calculate the energy needed to bring the soil to surface level. Remember the sides of the excavation lie at 45 degrees. Else, the whole would be constantly refilling itself.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd