Reference no: EM131240209 , Length: word count:1500
ASSIGNMENT BRIEF
Students should work individually. Work that exceeds the word limit by more than 10% of the total will be penalised.
QUESTION 1
Civils measurement has a number of differences to measurement using building codes. Provide a report on the following issues:
a) Provide an explanation of the major differences between civil engineering projects and building projects.
b) In CESMM 3 locational information generally has more emphasis than in building codes of measurement. Comment on why you think this is the case.
c) CESMM 3 "General Principles" 2.5 seems to be a contradiction, on the one hand it requires detail but in conclusion it requires brevity. Comment on this statement and list other CESMM 3 requirements which demand further description and/or itemisation in order to fully define what is required.
QUESTION 2
Project Brief
From the attached drawings nos.CE/2/A, B and C, and specification below, which represent a mooring dolphin in a tidal harbour:
(a) Prepare a taking-off list
(b) Using CESMM 3 take off the following:
Concrete work, formwork, reinforcement, piling and ancillaries.
Specification:
Location - WestHarbour.
MHWS = mean high water spring (tide).
Mooring dolphin head to be in designed mix concrete, mix ST2.- See additional information document.
Only measure a sample of the steel reinforcing rods, namely rods reference D1, and D2 see reinforcement specification on additional information document .
Isolated steel piles to be Round hex Box Piles No.3 section,weighing105.71kg/m,327x 330 mm, girth 112 mm. Each pile to be supplied with a cast steel shoe weighing 80 kg. All raking piles to be set at 1/3 inclination.
Piles to be fabricated and supplied to the following lengths; all vertical piles 16.50 m, raker piles 4 @ 17.00 m and 2 @ 18.50 m.
Outsides of piles, with exception of bottom 2.00 m shall be sand-blasted and painted with two coats of coal tar before pitching. After driving to the required penetration the piles to befilledwithconcretegradeC2,afterconcreteiscuredpilestobecutoffattheindicated level.
Coal tar to be removed from all surfaces in contact with the concrete dolphin head. Two rows of 25 x 25 mm mild steel bonding stubs each 180 mm long to be welded on to each face at the tops of the piles to provide a key for the concrete, (these are not shown on the drawings).
One vertical pile to have a pile test with a maintained loading of 350 tonnes with various reactions.
Attachment:- Layout.rar
Determine the average velocity through each of holes
: Water flows into a sink as shown in Fig. P12.6 at a rate of 2 gallons per minute. Determine the average velocity through each of the three 0.4-in.-diameter overflow holes if the drain is closed and the water level in the sink remains constant.
|
Bandwidth of a telephone transmission facility
: 1. Given an amplifier with an effective noise temperature of 10,000 K and a 10- MHz bandwidth, what thermal noise level, in dBW, may we expect at its output? 2. What is the channel capacity for a teleprinter channel with a 300- Hz bandwidth and a ..
|
Compute the gradient of the loss
: Suppose that we are now interested in predicting a numeric rating for each movie review. We will use a nonlinear predictor that takes a movie review x and returns σ(w ⋅ Φ(x)), where σ(z) = (1 + e-z)-1 is the logistic function that squashes a real ..
|
Compute pittman company''s break-even point in dollar sales
: Compute pittman company's break-even point in dollar sales for next year assuming. Determine volume of sales at which net income would be equal regardless of whether pittman company sells through agents or employs its own sales force.
|
Civil engineering projects and building projects
: Provide an explanation of the major differences between civil engineering projects and building projects - Prepare a taking-off list and CESMM 3 locational information generally has more emphasis than in building codes of measurement. Comment on why..
|
Determining the pseudocode and flowcharts
: General knowledge suggests that pseudocode or flowcharts can include clear and obvious logic errors. Give your opinion as to whether you believe it is worth time and effort to include possible logic errors that may arise during the development of ..
|
Shortly after the introduction of the computer
: Shortly after the introduction of the computer, someone said that two computers could undertake all the computing in the World. At that time the best computers were no more powerful than today's pocket calculators. The commentator assumed that com..
|
Which way is the water flowing
: Water flows steadily from one location to another in the inclined pipe shown in Fig. P12.34. At one section, the static pressure is 8 psi. At the other section, the static pressure is 5 psi. Which way is the water flowing? Explain.
|
What selling price should you place on your home
: What selling price should you place on your home? Explain using capital budgeting calculations. Assuming the market rate of interest is still 7.5%, what should be the price of this third home? Why?
|