Civil engineering for earthworks and substructures

Assignment Help Civil Engineering
Reference no: EM133220984

Civil Engineering Technology

Assignment - A bridge too far?

Learning Outcome 1: Explain the methods and techniques used in civil engineering for earthworks and substructures.
Learning Outcome 2: Present a site safety plan, risk assessment and method statement for a given civil engineering activity.
Learning Outcome 3: Evaluate a given civil engineering problem and propose a solution.
Learning Outcome 4: Prepare a design proposal for a new infrastructure project.

Assignment Brief:

Question 1: You work for a Civil Engineering company as a Trainee and are working on a major dual carriageway road construction works. The local council are bringing a delegation of councillors around the development and your boss asks you to provide him with the results of a desk-top survey outlining common methods and techniques used in earthworks and embankments. He asks you to cover the following in six posters:
1.Techniques used in deep excavations and trenching works.
2. Methods and techniques used to create complex foundations.
3. Methods and techniques used in piling works.
4. Methods and techniques used in drainage works. (include an explanation of groundwater problems and techniques used to deal with issues of ground and slope stability and temporary and permanent dewatering techniques).
5.Methods and techniques used in culvert construction.
6.Methods and techniques used in underpasses and utilities.

In order to prepare to answer questions from the councillors, you are asked to prepare a series of PPT slides (about 6 should suffice) in which you analyse methods and techniques used in large complex earthmoving operations and deep excavations, together with an evaluation of methods and techniques used to deal with issues of ground and slope stability.

Question 2: After the councillors have visited, they write a letter as with the following request:
"Can you provide a copy of the Safety Plan, the Risk Assessment and Method Statement that you spoke about for the road development site"

Your boss admits your department are not really compliant with the companies safety strategy. He asks that you create a more comprehensive document that he can forward to the councillors which identifies the hazards, risks and safety arrangements for excavations, working in confined spaces, working on structures and working within temporary works on highways.
The document you produce will have three sections: a safety plan, at least two risk assessments and at least two method statements for the road project that the councillors wish to see. In the document discuss how the three sections meet relevant health & safety legislation and codes of practice related to civil engineering sites and make a justification for the site safety plan, risk assessments and method statements report you have produced for the related earthwork activities at the site

Question 3: A late revision to the road project includes a slight deviation around some woodland. However, the deviation will include the construction of a bridge. You are asked to put together a report that discusses, proposes and justifies why the deviation needs to be made and what construction methods will be used to construct the bridge. Remember the road is a dual carriageway - but also needs to carry pedestrian traffic. The report (about 1500 words) should have discrete sections that address environmental contexts, quality contexts, geotechnical contexts. and economic contexts.

Question 4: As part of your traineeship, you are asked to work with the Design Team. They are working on the plans for the bridge. They ask you to put together an illustrated document that describes a range of methods and techniques used to create bridges and the different specifications of bridges.
Your illustrated document should include proposals for flexible highway construction foundation criteria and related geotechnical parameters together with descriptions of
• Methods and techniques used to create flexible highways.
• Methods and techniques used in highway link and junction design.
• Methods and techniques used in flexible pavement design.

Attachment:- Civil Engineering Technology.rar

Reference no: EM133220984

Questions Cloud

Explain how prison programming : Explain how prison programming has evolved over time. Discuss how prison programs prepare inmates for assimilation back into society.
Positives and negatives of community corrections : How would you describe modern community corrections? What are the positives and negatives of community corrections?
How nurses and nursing organization engage their communities : How can nurses and nursing organizations engage their communities in constructive ways when public health threats are imminent
Fly Like Girl : What is one thing aviation industry can and/or should do to bolster its diversification efforts? How many women and women of color were included in documentary?
Civil engineering for earthworks and substructures : Unit 18 Civil Engineering Technology - Higher National Certificate Construction and the Built Environment - Prepare a design proposal for a new infrastructure
How mediu perform in the education industry : In terms of Michael Porter's diamond of national advantage, How MEDIU perform in the Education Industry in Malaysia in the context of: Factor endowments.
How the interview may progress : Provide a detailed overview of how the interview may progress. Include each step of motivational interviewing in your discussion
Identify attributes that form your professional identity : Identify 10 attributes that form your professional identity. Determine the attributes that are important for nurse leaders
Assess for a common side effect of medication : A nurse is an administering a prescribed dose of dexamethasone to a client following cranial surgery which would the nurse implement to assess for a common side

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the break frequency

Using the results of part (a), determine Vo /Vi at 100 Hz, 1 kHz, 2 kHz, 5 kHz, and10 kHz, and plot the resulting curve for the frequency range of 100 Hz to 10 kHz. Usea log scale.

  Compute the bending moment m exerted

The uniform horizontal rod has a mass of 20 kg and is welded to the block at B. Friction in the guide is negligible. Compute the bending moment M exerted by the weld on the rod at B

  Calculate neuron output for the following transfer function

calculate the neuron output for the following transfer functions

  Determine the average shear stress developed by the friction

determine the average shear stress developed by the friction force on the tires. Assume the rubber of the tires is flexible and each tire is filled with an air pressure of 32 psi.

  Classify the soils using the given grain size distribution

Classify the following soils using the given grain size distribution (ASTM system) and Atterberg Limits data:

  Find the flow rate of water and the total rate of entropy

Carbon dioxide flows through a device, entering at 300 K, 200 kPa and leaving at 500 K. The process is steady state polytropic with n = 3.8, and heat transfer comes from a 600 K source. Find the specific work, specific heat transfer, and specific ..

  What is the expected annual savings and expected pw

An energy efficiency project has a first cost of $300,000, A life of 10 years, and no salvage value. Assume that the interest rate is 9%. The most likely value for annual savings is $60,000.

  Tension capacity of ub section and plates

A splice is made in a 360UB44.7 tension member by bolting it to plate on both sides of the web. Check the structural capacity under pure tension (maximum tension force T) using the section shown below (not to scale) by considering all the possible fa..

  Determine the distance from the left hand end of the beam

Draw the shear force and bending moment diagrams for the beam, making sure to include values for the maximum positive and negative bending moments and their locations. Also determine the distance from the left hand end of the beam to the point whe..

  The j-shaped member shown in the figure is supported by a

the j-shaped member shown in the figure is supported by a cable de and a single journal bearing with a square shaft at

  What is the maximum weight that can be suspended on poll

What is the maximum weight that can be suspended on a 16 Kg poll, 3/5 from the end. The maximum tension of the 30 degree guy-wire is 1500 N. Find the horizontal and vertical forces exerted on the poll by the hinge.

  Problem related to skaters with masses

Physics two skaters with masses of 65 kg and 45 kg, respectively stand 8.0 m apart each holding one end of a rope.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd