CIVE 3013 Steel and Timber Design Assignment

Assignment Help Civil Engineering
Reference no: EM132520219

CIVE 3013 Steel and Timber Design - University of South Australia

STATE DRILL CORE LIBRARY FACILITY DESIGN BRIEF

PROJECT BACKGROUND

The South Australian Drill Core Reference Library hosts geological samples recovered from over 130 years of exploration for minerals and energy resources in South Australia. These irreplaceable samples represent valuable direct records of the geological materials retrieved from the depths of the crust, which will continue to be investigated and analysed by new generations of geologists in industry, research, education and government. The facility consists of three main areas, that vary in use and their design and construction methods; the hylogger, the library and the administration building. The facility was constructed in 2015 as part of the Tonsley Redevelopment, Clovelly Park.

PROJECT SCOPE
The scope of this project is to design and document some of the main structural roof and floor elements for the Administration Building of the State Drill Core Library Facility. The focus will be on the part of the building located between Grids BA and BF, B1 to B11 on Structural Drawings ST-200, ST-303 and Architectural Drawing A128.

Firstly determine the design loads on the building (remember to consider the whole building for wind loads) and then design the structural framing members using steel and then timber. The structural elements you will be designing are a roof beam, first floor beam, column, lateral bracing system and a connection detail (for bonus marks).

The following items are not in the scope of this project:
• Any concrete elements including the design of the first floor slab
• Earthquake design
• Fire resistance design
• Ground floor slab or footing design

DESIGN CONSTRUCTION - ADMINISTRATION BUILDING

a) Ground and first floor exterior walls: Lightweight stud wall or glazing with aluminium composite façade panels supported on steel framed fascia trusses. Refer to Architectural drawing A202 for details.

b) Roof: Metal sheeting with insulation under, on steel purlins and rafters as shown on the architectural drawings A303 and A630.

c) Floors: The first floor is a reinforced concrete one-way slab 120mm thick supported on steel beams and columns. The ground floor is an industrial raft slab on ground with pad footings.

PROJECT TEAM

For each design you are required to work in a project team of three (3). Each team will be more effective in their effort to address the project scope in the time duration allowed than an individual. If there are an uneven number of students in the class, one group of four (4) students ONLY will be allowed. Please submit your preferred groups in an email to Danda Li by the end of Week 2. All team members MUST be in the same timetabled design project session.

Please note the initials of the student responsible for particular calculations on each page or include a summary of the work distribution between the team members in each of your submitted reports.

Attachment:- Steel and Timber Design.rar

Reference no: EM132520219

Questions Cloud

Premise and conclusion of argument based on statistics : What is the premise and conclusion of the argument based on statistics? Determine whether or not the argument uses any deceptive statistics.
What are these codons known as and how do they function : The codons UAA, UAG and UGA do not code for an amino acid. What are these codons known as and how do they function?
Find what is the equipment net present value : What is the equipment net present value?A piece of equipment has a cost of $25,000. The equipment will provide cost savings of $4,500 each year for ten years
What positive outcomes could international aid cause : What positive outcomes could international aid cause? What unintended negative outcomes can be caused by international aid?
CIVE 3013 Steel and Timber Design Assignment : CIVE 3013 Steel and Timber Design Assignment Help and Solution, University of South Australia - Assessment Writing Service - Determine the design loads
By how much will the increase project npv : Suppose the firm can cut its requirements for working capital in half by using better inventory control systems. By how much will this increase project NPV?
What were the total variable expenses in store m for month : What were the total variable expenses in Store M for the month? Leis Retail Company has two stores: M and N. During March, Store N had sales of $180,000
What are objectives accomplished by cash flow statement : It is necessary for an auditor to require a cash flow statement. What are the objectives that can be accomplished by cash flow statement?
What objectives that accomplished by cash flow statement : What are the objectives that can be accomplished by cash flow statement? Although income statement and balance sheet provide the vast majority

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd