Choose a project leader who has influenced you the most

Assignment Help Project Management
Reference no: EM13314232

Choose a project leader who has influenced you the most in your life or career. The leader could be a famous person or a local personality such as the president of a social club of which you are a member. Discuss the leader's specific traits that made him or her effective. Was his or her leadership style similar to one or more leadership styles that you studied this week? If yes, indicate which leadership styles were similar and explain why you think so. 

Reference no: EM13314232

Questions Cloud

What work was done on the object by this frictional force : A 1 kg object rests at the top of a quarter pipe cylindrical ramp of radius 1 m. What work was done on the object by this frictional force
How much can the company afford to spend per month : Wheeling-Pittsburgh Steel is investigating whether it should it should replace some of the basic oxygen furnace equipment now or wait to do it later. The cost later (i.e. 3 years from now) is estimated to be $1,700,000.
What are the moment vectors from f about a-b and c : A small blimp is temporarily moored wherein DC and the centerline of AB are coplanar. A force F from wind, weight, and buoyancy is shown acting at the centerline of the blimp. If F = 5i+ 10 j + 18 k kN
How long does it take the electron to come to rest : An electron has an initial velocity of 3.00 multiplied by 106 m/s in a uniform 10.0 multiplied by 105 N/C strength electric field. How long does it take the electron to come to rest
Choose a project leader who has influenced you the most : Choose a project leader who has influenced you the most in your life or career.
Determine the design a typical joint 50mm wide : A floor is to be supported on hardwood timber joists that are spaced at 0.5m centres and span 5.0m. The joists support flooring 20mm thick and an applied live load of 2kN/m2 Design a typical joint 50mm wide
Design and implement in matlab an algorithm for lcs problem : Find the longest common subsequence of any two sequences of symbols which have no repeated symbol.
Determine the maximum deflection of the beam : A hardwood beam of rectangular cross-section 150x300 is simply supported over a span of 8m, and is loaded as sketched. Determine the maximum deflection of the beam. (Youngs modulus E = 12 x 10^3 MPa)
Social obligations and engaging in social responsiveness : Does the organization focus more on meeting social obligations, engaging in social responsiveness,

Reviews

Write a Review

Project Management Questions & Answers

  Analyzing a proposed project

Thomas Mfg. is analyzing a proposed project. The company expects to sell 8000 units. plus or minus 2%.

  Explain what is the cost variance and schedule variance

Explain what is the cost variance, schedule variance, cost performance index (CPI), and schedule performance index (SPI) for the project and how is the project doing? Is it ahead of schedule or behind schedule? Is it under budget or over budget?

  Preparing a responsibility matrix

Prepare a responsibility matrix and clarify all roles.

  Computing value of the depreciation tax shield

The company has a marginal tax rate of 34 percent. What is the value of the depreciation tax shield?

  Activities required to successfully manage project

From a project management perspective outline the activities required to successfully manage this project, ensuring that it is on time, and within budget.

  Describe the levels of uncertainty

Describe the levels of uncertainty and complexity for the project and determine what the project manager should communicate to the customers about the project unknowns.

  Describing phases of the project management

Process Phases and Knowledge Areas. Describe each of the phases of the project management process and its related knowledge areas. List the major activities in each phase.

  Lowest ratio mixed assembly planning

Lowest Ratio Mixed Assembly Planning - For that mixture what is the lowest ratio mixed model assembly sequence

  Write paper on inventory management system

Write paper on Inventory Management System.

  Initiating periodic upgrades based on current trends

The sales manager is always focusing on how to improve customer service. Initiate periodic upgrades based on current trends.

  Explaining projects assist organizations

How do projects assist organizations and people to accomplish things?

  Costs of protecting against project failure

What are the costs of protecting against project failure?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd