Chapter 3 - determine the slope of the line graphed

Assignment Help Mathematics
Reference no: EM13879132

Chapter  - 3

1. Complete the ordered pair so that it satisfies the given equation.

y = 7x - 13: (4, ___)

A) (4, 16) B) (4, 28) C) (4, 15) D) (4, 41)

2. Which point below is located at coordinates (-1, 3)?

2366_Coordinates.png

A) K B) G C) M D) A

3. Which figure below is the correct graph of the linear equation y = -2x - 1?

2471_graphs.png

 

4. Which figure below is the correct graph of the linear equation x = 3?

809_graphs1.png

 

5. Find the x- and y-intercepts of 4x + 3y = -12 and use them to graph the equation.

2321_graphs2.png

 

6. The budget deficit for the city of Gotham can be modeled by the equation

D = 1.2n + 13.5

where n is the number of years since 1990 and D is the deficit in millions of dollars. Which answer below correctly displays the graph of the equation?

1837_graphs5.png

 

7. Determine the slope of the line graphed below.

1055_graphs6.png

A) -1/3 B) Undefined C) 1/3 D) -3

8. Find the slope of the line that contains the points (8,6) and (-5,1).

A) 5/13 B) 13 C)-5/13 D) 5

9. Which of the following is the correct graph of the line through (3, 2) with slope 1/2?

1924_graphs7.png

 

10. Line l goes through (3, 2) and is parallel to the line through (4, 1) and (-3, 3). Find the slope of l.

A) Undefined B) 7/2 C) 3 D) -2/7

11. Gotham City's budget deficit was $6.2 million in 1993 and $2.4 million in 1998. Find the slope of the line through (1993, 6.2) and (1998, 2.4) and interpret your result.

A) -0.760 slope; the slope of the deficit is decreasing by $0.760 million per year
B) -0.760 slope; the deficit is increasing by $0.760 million per year
C) -0.760 slope; the deficit is decreasing by $0.760 million per year
D) -0.760 slope; the deficit decreased by $0.760 million during the period between 1993 and 1998.

12. Find the slope and the y-intercept of the line represented by 6x + 7y = -12.

A) slope -6/7and y-intercept(0, -12/7)

B) slope 7/6 and y-intercept (0, -7/12)

C) slope 7/6and y-intercept (0, -12/7)

D) slope 6/7 and y-intercept (0, -12/7)

13. Write the equation y = 1/3x-2 in standard form using only integers and a positive coefficient for x.

A) x - 3y = 6 B) -x + 3y = -6 C) x + 3y = 6 D) x - 3y = 2

14. Which of the following is the correct graph of the equation y = 3x - 1?

1117_graphs8.png

 

15. Write an equation in slope-intercept form for a line l that goes through (9, -1) and has a slope of -1/3.

A) y= -1/3x +2 B) y= -1/3x - 2 C)y= -1/3x D) y= -1/3x + 2/3

16. A playground equipment manufacturer plans to spend $300,000 on a new facility plus $160 for each swing set made.The formula C = 160n + 300,000 gives the cost in dollars to manufacture n swing sets. What is the marginal cost of the nth swing set? [Hint - the marginal cost of the nth swing set is the difference in cost of producing n + 1 swing sets and n swing sets).

A) $170 B) $160 C) $300,000 D) $320

17. Find the equation (in standard form) of the line through (2, -5) and (4, -6).

A) 2x-y = 8 B) x+2y = -8 C) x + 2y = 8 D) 2x + y =8

18. Line l goes throught the point (5,-2) and is perpendicular to the line through (-2, 1) and (-4, -2). Find the equation (in slope-intercept form) for l.

A) y = 2/3 x-2  B) y = 2/3x - 16/3 C) y = -2/3 x +4/3 D) y = -3/2x-2/3

19. The price of a 2-hour plumbing repair job is $130 and the price of a 5-hour job is $250. Write an equation for the cost C of a t-hour repair job and use the equation to find the cost of a repair job lasting 7 hours.

A) C = 40t + 50; $330 C) C = 40t + 40; $320
B) C = 40t; $280 D) C = 50t + 40; $390

20. Write a formula that expresses the relationship described below. Use k as a constant of variation.

u varies directly as v

A) u=  k/v B) u = kv C) u = k + v D) k = uv

21. Write a formula that expresses the relationship described below.

P varies jointly as x and y and P = 4 when x = 7 and y = -7

A) P = -4/49xy B) P = -(4/49)xy C) P = -(4/49)xy D) P = -(4/49).x/y

22. If s varies inversely as x and s = 4 when x = -4, then find s when x = 2.

A) -8 B) 4 C) -16 D) -2

23. The time to drive from Gotham City to Farmville varies inversely with the average speed. If the drive takes 6.2 hours at 42 mph, then how long will it take at 63 mph? Round to the nearest tenth of an hour.

A) 4.1 hours B) 3.5 hours C) 3.2 hours D) 3.7 hours

24. Does the point (2, 14) satisfy the inequality y ≤ 2x - 2?

A) No B) Yes

25. Which graph below correctly indicates the solution set of the linear inequality 2x-5y >3?

773_graphs9.png

 

26. Tim works at a bakery and can prepare a birthday cake in 4 hours. It takes him 5 hours to prepare a wedding cake. If Tim works a 40-hour week, which graph below correctly illustrates the number of each type of cake Tim can bake per week?

2121_graphs10.png

Reference no: EM13879132

Questions Cloud

Develop a general classroom rule to round : Please continue to remind yourself about the issue of rounding error and should develop a general classroom rule to round to a specific decimal point (i.e., 2 decimal points) for all calculations.
The company conducted a thorough internal audit : Conrad Playground Supply underwent a restructuring in 2013. The company conducted a thorough internal audit, during which the following facts were discovered.
Determining the pressure measurements : SAE 30 oil at 20°C flows in the 3-cm-diameter pipe in Fig, which slopes at 37° for the pressure measurements shown, determine
Discuss advantages of minimum value threshold : Using your preferred technique, identify a solution that addresses this concern while continuing to maximize the weighted total of the eco- logical score and scenic values given a budget of $25 million. Discuss the advantages and disadvantages of ..
Chapter 3 - determine the slope of the line graphed : where n is the number of years since 1990 and D is the deficit in millions of dollars. Which answer below correctly displays the graph of the equation - Determine the slope of the line graphed below.
Differences between learning organizations and learning : differences between learning organizations and learning communities
Viscous dissipation of energy : Problems involving viscous dissipation of energy are dependent on viscosity μ, thermal conductivity k, stream velocity Uo, and stream temperature to. Group these parameters into the dimensionless Brinkman number, which is proportional to μ.
Open globe valve : In Fig there are 125 ft of 2-in pipe, 75 ft of 6-in pipe, and 150 ft of 3-in pipe, all cast iron. There are three 90° elbows and an open globe valve, all flanged. If the exit elevation is zero, what horsepower is extracted by the turbine when the ..
The change promote greater comparability : In its annual report for the year ended January 31, 2011, Virco Manufacturing Corporation , a producer of school desks and other furniture, provided the following information regarding a change in inventory method (in part):

Reviews

Write a Review

Mathematics Questions & Answers

  Questions on ferris wheel

Prepare a Flexible Budget Gator Divers is a company that provides diving services such as underwater ship repairs to clients in the Tampa Bay area.

  Logistic map

This assignment has two question related to maths. Questions are related to bifurcation cascade and logistic map.

  Finding the probability of cards

This assignment has questions related to probabiltiy.

  Systems of ode

Find all the xed points, and study their stability and Draw the phase portrait of the system, as well as the graphs of the solutions in all relevant cases.

  Derive the boolean expression

Derive the Boolean Expression and construct the switching circuit for the truth table stated

  System of equations

Evaluate which equations are under-identified, just-identified, and over-identified.

  Linear programming problem

Linear programming problem consisting of only two constraints with one objective function.

  Find the natural domain

Find the natural domain of the given functions.

  Introduction to numerical methods

Compute the coecients of the polynomials using the term recurrence relation.

  Chart of the topological manifold

De?nition of smoothness of functions on a smooth manifold is chart independent and hence geometric.

  Mathematics in computing

Questions related on mathematics in computing.

  Complex problems

Complex problems

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd