CEM5ACS Advanced Construction Systems Assignment

Assignment Help Civil Engineering
Reference no: EM133134353

CEM5ACS Advanced Construction Systems - La Trobe University

Basement and Post-tensioned Concrete

Design Brief

This is a group assignment (2 students per group) on prestressed concrete framed within a single level basement structure.

A proposed development as detailed on the attached set of working drawings is to be constructed for "BLUESCOPE STEEL" which is Australia's largest distributor of steel. BlueScope intend to use the facility as a storage and distribution centre for rolls of Hot-Rolled coils. The development will consist of two levels: a single level basement and a ground level warehouse style structure built with steel portal frames. The proposed location is in a built-up area with existing buildings.

The basement area of the storage and distribution facility is to be used as a storage area for the rolls of coils as shown in Figure 1; while the ground level suspended floor (slab over basement) will be built mainly to receive display racks for the rolls of coils as shown in Figure 2.

To date, an engineering design has been completed by a consultancy firm in Melbourne and they have proposed to use traditional reinforced concrete system to frame the basement and ground floor structural elements. As a guide for the geometrical layout of the proposed facility, the piles are places at 2000mm centres.

Assume you are working as an Assistant Construction Manager for a construction firm in Melbourne that does design and construct (D&C) projects. Your supervisor has asked you to develop a technical report and to propose an alternative structural system for the proposed development. To prepare your report, the list of tasks outlined below must be addressed.

Your written report must include either detailed scale drawings or neatly hand drawn drawings and embodied within the text. Make sure your report answers and covers all the sections listed below and that the report is set out with each response is numbered accordingly.

To complete your report, students are allowed to use information provided in this brief, provided sample drawings and lecture content together with your own research, explanations provided during the assignment brief and knowledge of basements and prestressed concrete design concepts.

Tasks

1. Based on the working drawings made available to complete your report, provide a brief description (in point form) of the structural framing system prescribed for the proposed construction of the basement and ground floor. Include the geometric properties where applicable. (Minimum 8 valid points to be listed)

2. Briefly explain the reasons why the engineer has prescribed the various documented footing and retention system parts given in the drawings. Including a list of all consideration you will need to consider during construction of the basement. (Minimum 4 valid reasons and 7 valid considerations to be provided)

3. Using dot points, list a sequence of constructing the proposed development up to and including the ground floor slab.

4. Due to the high storage loads that will be imposed on the concrete floor slabs, it is required to replace the basement floor and suspend ground floor with a post tensioned concrete system using only 12.7mm strands. You are required to develop the following:

a. Detailed plan layout of the post tensioned floor for both the basement floor and the ground floor slabs. Provide a legend of symbols for the constituent elements provided.

b. Assume a band beam 1200 wide will be required along grid line C of the suspended ground floor slab, draw a detailed longitudinal section of the tendon profile along the entire length of the grid line C and between grids 1-9. Briefly explain why the tendon profiling has the shape you have drawn.

c. Draw a cross section of the tendon profiling along grid line 8.

5. The owner have requested that they do not need any internal column in the basement. Provide an alternative construction system that can be employed for constructing the suspended floor to achieve a column free basement and provide reasons your answer. Develop a floor framing plan and calculate what will be the maximum imposed load that the owner can put over the suspended slab.

Assessment
Students must submit a written report, accompanied with either detailed scale drawings or annotated photographs embodied within the text. Make sure your report answers and covers all the sections listed below and that the report is set out and each response is numbered accordingly

Compile your report and provide a completed cover sheet of the report. Students will earn a maximum of 25% marks for this assignment.

The report should be submitted in A4 format and A3 for drawings and a maximum of 10 pages including cover sheet, lead page, content page and list of references (if any) and additional sketches and drawings. All sketches must be annotated and indicate member sizes. Attached a cover page (available on LMS). Use note form only in your report, this assignment is not to be done in an essay format.

Attachment:- Advanced Construction Systems.rar

Reference no: EM133134353

Questions Cloud

How should management calculate the activity : For the month of July 2021, the company budgeted direct materials in the amount of $80,000. How should management calculate the activity
Determine the inventory balance altira would report : Determine inventory balance Altira report in its August 31, 2021, balance sheet and the cost of goods sold it would report in its August 2021 income statement
What is the change in profits : What is the change in profits if, instead of the traditional method that YPI has used thus far, the bottleneck method advocated by Jay
What is peter ltd more likely to do to account : Flash Ltd owns 40% of the shares in Parker Ltd and Arrow Ltd owns the remaining 20% shares in Parker Ltd. What is Peter Ltd more likely to do to account
CEM5ACS Advanced Construction Systems Assignment : CEM5ACS Advanced Construction Systems Assignment Help and Solution, La Trobe University - Assessment Writing Service
Set up a lagrangian equation : Consider a household whose utility is determined by the consumption of two goods, A BcA cB A B UcBcA cB and . Let and denote the consumption of good and good ,
Prepare the journal entries to record the sale on november : Prepare the journal entries to record the sale on November 17 (ignore cost of goods) and collection on November 26, 2021
What is culturally responsive instruction : What is culturally responsive instruction and what does it look like in content area classrooms?
Determine the equilibrium interest rate : Using the Bond Market analysis explain the effect of each of the following on the equilibrium interest rate

Reviews

len3134353

4/28/2022 1:47:35 AM

in this assignment there is given one werehouse example, so need to answer questions according to warehouse Means proceger of construction, so first check soil condition of site, load capability..... need to answer according to Site

Write a Review

Civil Engineering Questions & Answers

  Calculate the necessary flow rate of air

Calculate the necessary flow rate of air (cfm) moving over a heat exchanger if the heater is rated at 6,000 btu /hr.

  What will be the hardness and alkalinity of the mixture

If a student mixes 500 ml of a solution containing 50 mg/l of CaCl2 with 500 ml of containing 50 mg/l of NaHco3 what will be the hardness and alkalinity of the mixture of mg/l as CaCo3

  Find back pressure that will lead to maximum possible rate

A convergent-divergent nozzle has a throat diameter of 0.05 m and an exit diameter of 0.1 m. The inlet stagnation state is 500 kPa, 500 K. Find the back pressure that will lead to the maximum possible flow rate and the mass flow rate for three dif..

  Develop a convincing argument that your approach will work

This is a challenging problem. Unless you are unusually ambitious, you should stop short of a detailed design, which is tedious; just develop a convincing argument that your approach will work.

  Calculate the change in length of a 30m measuring tape

Calculate the change in length of a 30m measuring tape made of steel when its temperature changes by 84 F. The coefficient of thermal expansion for steel is x = 3.1 x 10^-6 per C

  Show the cycle on a t-s diagram with respect to saturation

Show the cycle on a T-s diagram with respect to saturation lines, and determine (a) the power input to the compressor, (b) the rate of heat removal from the refrigerated space, and (c) the pressure drop and rate of heat gain in the line between th..

  Determine at which of the two points the elevation is higher

At point 2, the velocity and pressure are 14 ft/s and 23 psi. Determine at which of these two points the elevation is higher. Calculate the height difference. (Assume the sp ecific gravity of butane is 0.6 and that the butane is at a temperature o..

  Determine the expected drawdown in the pumping well

The drawdown in another observation well 60 m from the pumping well is 1.1 m. Calculate (a) the hydraulic conductivity of the aquifer, (b) the expected drawdown in the pumping well,

  Do you believe it is plausible that the blocks do not meet

Do you believe it is plausible that the blocks do not meet the specification, or are you convinced that the blocks meet specification? Explain your reasoning.

  Determining a maximum safe speed

The central angle is 35 degrees, the superelevation is 0.08, and 20.6 ft is cleared (for sight distance) from the inside edge of the innermost lane. Determine a maximum safe speed (assuming current design standards) to the nearest 5 mi/h.

  Determine maximum possible precipitation at new york city

Determine the maximum possible precipitation at New York City that may be encountered on a 100 mi^2 drainage area over a 96 hr period.

  Equilibrium partial pressure of benzene in gas

Benzene is to be absorbed from coal gas by means of a wash oil. The inlet gas contains 3% by volume of benzene, and the exit gas should not contain more than 0.02% benzene by volume. The suggested oil circulation rate is 5 kg oil per 1m3 of inlet gas..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd