Reference no: EM132499218
CEG 4011 Geotechnical Engineering - Florida International University
You are hired as a consultant for a project to construct an offshore resort. The resort will be built on an artificial fill (γt = 20kN/m3) of high permeability, which will cover a much larger area compared to the plan area of the resort.
To determine: Your job is to determine:
(i) Overall mass geometry of the resort (i.e., plan and elevation including Height of resort, Hresort)
- It does not need to be a boring rectangular prism shape building. You can use your imagination as much as you can to design a unique shape (to make it as a landmark, e.g., FIU SIPA Building).
(ii) Height of fill, Hfill
Goal: The goal is to make the center of resort (at the ground level) to be 1m above the water level at the end of primary (EOP) consolidation.
Constraints: The following constraints are applied:
(i) Each story is 3 meters high. The vertical surcharge by each story is 100 kPa, e.g., stress applied by a 3-story height of the building is 300 kPa.
(ii) The plan area at the ground level you designed should be between 500 m2 and 1000 m2.
(iii) Use Boussinesq solution to compute the stress increase by building the resort. You can use the charts provided in the lecture slides and/or the theoretical equation, i.e., you can use the Boussinesq solution for the vertical point load and then analytically or numerically integrate over the designed plan area to estimate the stress increase.
Attachment:- Geotechnical Engineering.rar
What is the most inventive or innovative thing have done
: What is the most inventive or innovative thing you've done? It doesn't have to be something that's patented. It could be a process change
|
Discuss the complications that might develop in the patient
: Relate history to the diagnosis. What risk factors are present, and how does each predispose to disease? Explain the cause of the disease in this patient.
|
Determine pension expense
: Prepare the journal entries to record (a) pension expense, (b) gains and losses (if any), Determine pension expense for 2021
|
Determine the internal rate of return for a project
: Determine the internal rate of return for a project that costs -$104,000 and would yield after-tax cash flows of $16,000 the first year
|
CEG 4011 Geotechnical Engineering Assignment
: CEG 4011 Geotechnical Engineering Assignment help and solution, Florida International University – Homework Help - compute the stress increase by building
|
Heavy rain cost of retained earnings
: What is Heavy Rain's cost of retained earnings using the Gordon Model (DDM) approach? Round the answers to two decimal places in percentage form
|
Prepare the journal entries to record pension expense
: Prepare the journal entries to record (a) pension expense, (b) gains or losses, (c) prior service cost, (d) funding, and (e) payment of benefits for 2021
|
Describe the kinds of problems that can occur
: Describe the kinds of problems that can occur when emergency management response plans require intra-governmental and multi-organizational cooperation?
|
What is the value of the swap to the financial institution
: What is the value of the swap to the financial institution? Assume all interest rates are continuously compounded.
|