Reference no: EM13104207
Rochester Manufacturing Corporation (RMC) is considering moving some of its production from tranditional numerically controlled machines to a flexible manufacturing system (FMS). Its computer numerical control machines have been operating in a high-variety, low-volume manner. Machine utilization, as near as it can determine, is hovering around 10%. The machine tool salespeople and a consulting firm want to put the machines together in an FMS. They believe that a $3 million expenditure on machinery and the transfer machines will handle about 30% of RMC's work. There will, of course be transition & startup costs in addition to this.
The firm has not yet entered all its parts into a comprehensive group technology system, but believes that the 30% us a good estimate of products suitable for the FMS. This 30% should fit very nicely into a "family". A reduction, because of higher utilization, should take place in the number of pieces of machinery. The firm should be able to go from 15 to perhaps as low as 3. Similarly, floor space reduction will go from 20,000 square feet to about 6,000. Throughput of orders should also improve with processing of this family of parts in 1 to 2 days rather than 7 to 10. Inventory reduction is estimated to yield a one-time $750,000 savings, & annual labor savings should be in the neighborhood of $300,000. Although the projections all look very positive, an analysis of the project's return on investment showed it to be between 10% and 15% per year. The company has traditionally had an expectation that projects should yield well over 15% and have payback periods of substantially less than 5 years.
1) As a production manager for RMC, what do you recommend? and why?
2) Prepare a case by a conservative plant manager for maintaining the status quo until the returns are more obvious.
3) Prepare the case for an optimistic sales manager that you should move ahead with the FMS now.
Success on patients with degenerative knees
: Microfracture knee surgery has a 75% chance of success on patients with degenerative knees. The surgery is performed on 5 patients. Find the probability of the surgery being successful on less than 3.
|
Determining chip probability
: A bowl contains R red and W white chips. Suppose N chips are drawn without replacement from the bowl.
|
Probability that the sprinkler system will come on
: In case of fire, the probability that D1 operates correctly is 0.95 and the probabilty that D2 operates correctly is 0.92. Find the probability that the sprinkler system will come on.
|
Determining independent trials
: Suppose a sequence of independent trials is performed where each trial results in either success or failure. Suppose X=the number of failures before the first success, with p=probability of success on any one trial.
|
Case study - rochester manufacturing corporation
: Rochester Manufacturing Corporation (RMC) is considering moving some of its production from tranditional numerically controlled machines to a flexible manufacturing system (FMS).
|
Variables to help you predicting the risk
: Develop the "best" regression model possible using this set of variables to help you predict the Risk. State your final model. Interpret the coefficients for the model (i.e. what do the numbers mean?). Finally, tell me how to use this model for pr..
|
Probability of incoming phone calls
: A certain company relies heavily on phone orders. Suppose past records show that R% of all incoming phone calls to this company are orders from customers.
|
How transitions assist with the flow of the cause
: Write down some common transitions? How might transitions assist with the flow of the cause and effect essay? Do certain transitions influence the key point of your essay?
|