Case study - managing lean project

Assignment Help Project Management
Reference no: EM132109231

Assessment Case study: Managing Lean Project

Introduction

You have been given the task to organise the FIFA 2018 World Cup football tournament.

(For those not familiar with football, you may change the event to the recently concluded 2018 Gold Coast Commonwealth Games)

Your tasks

This assessment item requires you to work INDIVIDUALLY.

1. As the project manager in charge of delivering such as an important world sporting event:
i. Identify and elaborate the following terms with regards to the event.
a. Voice of the Customer (VOC)
b. Critical to Customer Requirements (CCR)
c. Critical to Quality parameters (CTQ)
ii. In what ways would you have implemented lean project management for this event?
iii. Identify and elaborate processes from PMBOK, PRINCE2, Organisational Project Management, Agile Practices and Lean Six Sigma (DMAIC Methodology) that could support your lean project implementation.

2. Your submission should be made using Microsoft Office documents and the ESSAY submitted as a separate 2,500 - 3,000 word Microsoft WORD document. Text beyond the 3000 word limit WILL NOT BE MARKED. Text length less than 2500 words will be penalised by 5% of the total available marks.

3. Supporting diagrams / figures may be presented in other formats - Excel, PowerPoint slides, PDF documents, as part of the appendix and will not count towards the essay's word limit. The reference list will also not be included in the word count.

4. Tables should be placed in the essay and shall be included in the word count.

5. Your submission should be a properly constructed to an academic standard. It should contain an effective introduction, body and conclusion. The introduction should introduce the essay and include your argument. The body should present the justification to support your recommendations, provide your assumptions and finally, provide a conclusion that should restate your recommendations on a high level.

6. The submission should contain a coherent, but necessarily restricted review of the academic literature on the project management topics in question. The literature review should be integrated into the essay, not a separate section. Do not include an executive summary or an abstract.

7. This assessment item involves researching your assigned topic to enhance your understanding of lean project management concepts and utilisation of academic literature. Whilst you use the recommended textbooks and lecture materials, you may also refer to relevant peer reviewed, academic journal articles. A reference list (comprising between 5 - 10 references) formatted in the prescribed APA style is compulsory.

Verified Expert

This paper is about VOC, CCR, and CTQ are discussed in terms of FIFA World cup in this essay. Implemented lean project management for FIFA World cup is and processes from PMBOK, PRINCE2, Organizational Project, Lean Six Sigma, Management Agile Practices as well as that could support the lean project implementation are also discussed in this assignment.

Reference no: EM132109231

Questions Cloud

Concept of the business cycle : Explain what Fred meant using the concept of the business cycle, durable and non-durable industries.
Write a single statement that assigns num_ones with the num : A cashier distributes change using the maximum number of five dollar bills, followed by one dollar bills.
Income or according to some other standard : Do you think a nation's output should be distributed according to income or according to some other standard (such as basic human need)?
Why do we define money : Why do we define money? What are the components of money supply?
Case study - managing lean project : You have been given the task to organise the FIFA 2018 World Cup football tournament - It should contain an effective introduction, body and conclusion
How many possible hosts can each subnet contain : How many unused subnets will be waiting on hold for future expansion, and how many possible hosts can each subnet contain?
Identify and elaborate processes from pmbok : project manager in charge of delivering such as an important world sporting event - In what ways would you have implemented lean project management for event
What is the cidr notation for the network id now : Starting with the network ID 192.16.20.0/24, what is the default Class C subnet mask for this network? Write this information both in decimal and in binary.
Compute the area and circumference of the circle : Write a C++ program that inputs the radius of a circle and then computes the area and circumference of the circle using the formua.

Reviews

inf2109231

11/29/2018 1:08:09 AM

Below are the details given for question ii). Ways or areas to implement lean project management: There is a marking distribution which says ‘identified more than THREE best practices’. So discuss any three or more in your answer. 1. Seek out waste reduction 2. Consider the value stream 3. Focus on customer 4. Organise around value streams 5. Think continuous improvement 6. Executive commitment 7. Keep leadership focused on long-term learning 8. Track performance and make results visible etc. You are expected to write about best practices, not the lean project management steps/stages for question ii). Follow the rubrics table for question (iii) as well. this is how you have to make for Pmbok and prince 2 30007534_1 E1562F 13-89B 7-4547- 92C1-B1 D991C5 12B7.p ng Perfectly work done by Experts Mind delivery before time and I am highly impressed by the work will give more assignments.

inf2109231

11/29/2018 1:07:57 AM

Thank you Gopi for sharing the details for Assignment 1, question ii) Follow the rubrics table for assignment 1. You can download it from Assessment 1 (Individual work – 40%) link. Check the breakdown of marks for each question in the table. There is a slight difference in what we discussed in the tutorial class today from the rubrics about Question

inf2109231

11/29/2018 1:07:45 AM

Please insert tables in your work and also insert some diagrams. I required more information about PMBOK, Prince 2, six sigma lean process as per the marking rubrics. all assignment and cut writing from starting phase and give more information about the last phase as per the requirement in marking rubric file. However for Question 3, you need to ensure that you address the following information: Please find below some hints and clarifications regarding Assignment 1, Remember to check the marks allocated in the marking criteria prior to writing. The last two methodologies have only 2 marks allocated to them.

len2109231

9/10/2018 5:07:14 AM

these are the lecture slides on which you can refer. make sure that you make a assignment from those mention books in the file of assignment description. please make a very good assignment as it has very high marks containing of overall marks for the unit. you have to use PMBOK and PRINCE2 books in order to fulfill the creteria of assignment

Write a Review

Project Management Questions & Answers

  Write a paper about project management certification

Write a paper about Project Management Certification - Its importance to business. Describing how these processes integrated into a safety program system?

  Total revenue generated by product

How long does it take for each product to be made based on the production plan? B. Raw Material Cost per product - Total revenue generated by product

  Does the firm empower its workers

Does the firm appear to recognize that its employees are the key to its success? Does the firm empower its workers? Does it encourage teamwork? Provide details?

  Examine the human resource factors that can impact project

Describe and demonstrate ethical practices in project management. Examine the human resource factors that can impact project management.

  Find the best pairs

A higher score indicates a higher degree of compatibility in the games of the two individuals concerned. Find the best pairs.

  Advantages and disadvantages of client interaction in design

What should be included in a report that summarizes the findings of a focus group?- Indicate the advantages and disadvantages of client interaction in the design and execution of a focus group study.

  What are the main types of grade and pay structures

What is base pay management?-  What is a grade structure?-  What is a pay structure? -  What are the main types of grade and pay structures?

  Discuss the before-during-after aspects of calling

A  discussion board due. The topic is as follows: Topic: Calling Resilient Warriors talks at length about the importance of "calling." Discuss the Before-During-After aspects of "calling," and relate this to your Particular vocation

  How to share project status information

What problems do you see emerging from a project such as SBInet where the government allows the contractor to determine scope, manage all contractor relations.

  What is meant by mass customization

What is meant by mass customization? How can market conditions and consumer desires affect customization?

  How long will it take to complete planes

How long will it take to complete planes 12 through 15 inclusive? At $40 per hour, what can Alwan, as purchasing agent, expect to pay for planes 12 through 15?

  What are the disadvantages of scheduling overtime

What are the disadvantages of scheduling overtime?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd