Case study - CBN Railway Company

CEO John Spychalski is concerned about a problem that has existed at CBN railroad for almost 20 years now. The continuous problem has been that the locomotives used by the company are not very reliable. Even with prior decisions to resolve the problem, there still has not been a change in the reliability of these locomotives. Between 2006 and 2007, 155 new locomotives were purchased and one of CBN's repair shops was re-novated. The renovated shop has been very inefficient. Spychalski estimated that the shop would complete 300 overhauls on a yearly basis, but instead it has only managed to complete an average of 160 overhauls per year.

The company has also been doing a poor job servicing customers (that is, providing equipment). CBN has averaged only 87 to 88 percent equipment availability, compared to other railroads with availability figures greater than 90 percent. Increased business in the rail industry has been a reason for trying to reduce the time used for repairing the locomotives. CBN's mean time between failure rate is low-45 days-compared to other railroads whose mean time between failure rates is higher than 75 days. This factor, Spychalski feels, has contributed to CBN's poor service record.

CBN is considering a new approach to the equipment problem: Spychalski is exam-ining the possibility of leasing 135 locomotives from several sources. The leases would run between 90 days to 5 years. In addition, the equipment sources would maintain the repairs on 469 locomotives currently in CBN's fleet, but CBN's employees would do the actual labor on the locomotives. The lease arrangements, known as "power-by-the¬mile" arrangements, call for the manufacturers doing the repair work to charge only for maintenance on the actual number of miles that a particular unit operates. The company expects the agreements to last an average of 15 years. John Thomchick, the executive vice president, estimates that CBN would save about $5 million annually be¬cause the company will not have to pay for certain parts and materials. Problems with the locomotives exist throughout CBN's whole system, and delays to customers have been known to last up to five days. Spychalski and Thomchick feel that the leasing arrangement will solve CBN's problems.

CASE QUESTIONS

In 200 - 250 words, address the following question:

"Do you think that the decision to lease the locomotives was the best decision for CBN"?

Reference

Coyle, J., Novack, R.A., Gibson, B.J., & Barbi, E.J. (2011). Transportation: A Supply Chain Perspective (7th ed). Mason, OH: South-Western Cengage Learning.

Verified Expert

In the attachment of solution contains around 250 words including references, The Topic of case study is "CBN Railway Company" is solved with the given problems.

Reference no: EM13964769

Questions Cloud

How many wavelengths of sound are contained in this distance : Assuming that the sound frequency is 523 Hz, how many wavelengths of sound are contained in this distance?
Calculate the divergence and curl of the vector field : Use Green's theorem to calculate the work done when a particle is moved along the helix x = cos t, y = sin t, z = 2t from (1,0,0) to (1,0,4pi) against the force F(x,y,z) = -yi +xj +zk.
Spend and wants to earn dividends : Gretchen Schmidt plans to buy shares of two stocks. One costs $32 per share and pays dividends of $1.20 per share. The other costs $23 per share and pays dividends of $1.40 per share. She has $10,100 to spend and wants to earn dividends of $540. H..
Discuss the stability of resulting atmospheric temperature : At night, the surface temperature over land drops by 10 K (to 300 K), the surface temperature over the ocean remains the same (306 K), and the temperature at 0.5 km over both land and ocean drops by 5 K (to 300 K for both). Discuss the stability o..
Case study - cbn railway company : Do you think that the decision to lease the locomotives was the best decision for CBN - Case study - CBN Railway Company
Gauss-jordan elimination to solve the system : Set up the augmented matrix while using Gauss-Jordan elimination to solve the system. Provide some notation showing how to proceed from one augmented matrix to the next.
Find the magnitude of the electric flux through the sheet : A flat sheet is in the shape of a rectangle with sides of lengths 0.400 m and 0.600 m . The sheet is immersed in a uniform electric field of magnitude 74.5 N/C that is directed at 20 degrees from the plane of the sheet. Find the magnitude of the e..
Amount of labor-hours based on shifts : Write a matrix A that denotes the amount of labor-hours based on shifts and each type of labor (carpenter, electrician, or plumber). Write a column vector B representing labor costs per shift.
What is allowable power dissipation from the upper surface : From wind tunnel tests under the same flow conditions , the average frictional shear stress on the upper surface is determined to be 0.0625N/m^2. What is the allowable power dissipation from the upper surface of the board if the average surface te..

Reviews

Write a Review

Project Management Questions & Answers

  Using project risk management

Prepare a risk management plan for school as a school authority - take an example of the recent gun shoot incident in the United States.

  Explain the project scope and project management plan

Describe the project scope and project management plan. Analyze the type of staff that your company would need in order to make the manufacturing switch to motorcycles with larger motors

  Case study- critical planning for project success

Case Study: Critical Planning for Project Success,  List the activities that must be performed to complete the requirements definition of an IT project based on the provided articles

  Warm tropical region in the pacific ocean

The Palm Trees Spa is a premium resort located in the warm tropical region in the Pacific Ocean. It has successfully blended the concept of combining sea, sand and sun to provide the visitors a dream holiday right from its launch five years ago.

  Controlling measures taken during the planning phase

What controlling measures should be taken during the planning phase.

  Specify the performance criteria for the project

Project Performance: List the desired outputs from the project and specify the performance criteria for the project.

  Evaluate the importance quality of service has to designers

Evaluate the importance quality of service has to designers. Choose two areas discussed in the textbook you would focus your attention to ensure quality of service for a team of designers that you were managing. Justify your choices.

  Purchase of the product or service to your company

Presentation: Your assignment is to choose a products or services and develop a marketing initiative that if implemented might lead to purchase of the product or service to your company

  Why should all projects include risk in project planning

Why should all projects include risk in their project planning and what are some of the drawbacks if risks are not considered?

  Project management - the value of progress reports

Show why are progress reports an integral part of project communications and what should they include? How are they different from a final report?

  Explaining important level of quality

Of these six, which do you consider to be the most important level of quality and why?

  Which activity has the greatest amount of slack

Which activity has the greatest amount of slack? How sensitive is this network? Identify two sensible milestones and explain your choices.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd