Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Dust is removed from the airstream of a municipal incinerator by four dust collectors operating in parallel, each handling 1/4 of the total airflow of 200 m3/min. The airstream contains 10 g/m3 of suspended solids. The collector efficiency is 98%, decreasing linearly to 74% as air flow is doubled. If the maximum permissible solids concentration from the combined stack discharge [all 200 m3/min] is 1.0 g/m3, can one collector be temporarily taken out of service by: (a) overloading the other 3 units [i.e., each of the three handling 1/3 of the total flow], or (b) by not treating 1/4 of the airflow [i.e., mixing 150 m3/min of treated air with 50 m3/min of untreated air]?
Determine the horizontal distance, given:Stadia Top=8.5 ,Stadia Bottom 6.21, vertical angle= -8 degrees 42 minutes.
The New Jersey Surety Association, in various documented publications discusses the Surety’s relationship with their clients, the best ways to better know your Surety and a brief overview of why the Construction Business can fail.
A pond has a surface area of 1.0 acre. A stream flows into the pond at 1.2 cubic feet per second for the entire year. The evaporation rate, also steady for the entire year, is 1 in. /month. Assume that the pond is in the shape of a cylinder.
It rains 3.0 in. on a 20.0 acre watershed. What is the volume of rainfall excess if 30% of the watershed area is a lake and infiltration on the soil is estimated at 1.0 in? What is the total volume of runoff? Express your answer in cubic feet.
An intelligence data bank center requires power 24 hours a day, 7days a week. If the main power grid fails, a backup power supply isinitiated.
An equal-tangent crest vertical curve is designed with a PVI at station 110+00 and a PVC at station 107+43.3. if the high point is station 110+75.5 what is the design speed of he curve?
Are there any situations when parallel flow option may be preferred instead of a counter flow heat exchanger
A 25-mm diamenter shaft is pulled through a cylindrical bearing as shown. The lubricant that fills the 0.3-mm gap between the shaft and bearing is an oil having a kinematic velocity of 8.0x10^-4 m^2/s and a specific gravity
Water with a static pressure of 1.96kN/M2 flows through an 800 mm diameter pipe. A pitot tube pressure gage in this pipe reads a pressure of 5.88 kN/M2. How do you determine the volume flow rate (Q) of the water? (Q = 1.40 M^3/sec, V=2.79 M/sec)
The center post B of the assembly has an original length of 124.7mm, whereas posts A and C have a length of 125mm. If the caps on the top and bottom can be considered rigid
in what ways were the projectacirc??s planning and scope management appropriate? when did the planners begin taking
How many moles of aluminum do 5.2×1024 aluminum atoms represent?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd