Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Can a contractor claim that liquidated damages should be limited? Because of political unrest, only 20% of rooms are occupied. Liquidated damages are set to $30000 per day -> reasonable amount Contractor is late 15 days. Contractor claims that 20%*30000=$6000 per day should be paid, because only of rooms are occupied.
Select the sentence that is punctuated correctly.
A laboratory consolidation test was performed on a clayey soil specimen, which was drained on both top and bottom. The time for 50% consolidation was 6.2 minutes, and the specimen's thickness at 50% consolidation was 0.740 in.
Determine the elastic and plastic section modulus of the I-beam. The axis runs through the center of the beam on both x and y axis (completely symmetrical). Beam properties: h= 12inches tf= 0.5 inches bf= 6 inches tw= 0.25 inches
A 1.2-in. rainfall occurs in a 6-hour duration. If this represents an exceedence probability of 10%, what is the probability it will be equaled or exceeded at least once in the next 3 years. What is the probability it will be equaled or exceeded e..
A bullet is fired from a height of 150m at a velocity of 300kmph at an angle of 35 upward. Neglecting air resistance. Find: a) total time of flight b) horizontal range
A gate having the cross section is 4 ft wid and is hinged at C. The gate weighs 18,000 lb, and its mass center is 1.67 ft to the right of the plane BC. Determine the vertical reaction at A on the gate when the water level is 3 ft above the base.
A gas is compressed at a constant pressure of 0.800 atm from 9.00L tp 2.00L. in the process, 400J of energy leave the gas by heat. (a) What is the work done on the gas? (b) What is the change in it internal energy?
The depth to water in A is 210 ft, in B is300 ft, and C is 230 ft. Determine the direction of ground water flow through the triangle ABC and calculate the hydraulic gradient. If the aquifer hydraulic conductivity is 30 ft/day, estimate how far gro..
Find depth of water flow in Rectangular channel, Water is flowing in a rectangular channel whose width is 5m
the circular top of a can has a radius of .0320m. the pull-tab has an area of 3.8x10^-4 m^2. the absolute pressure of the carbon dioxide in the can is 1.40x10^5Pa. find the force that these gas generates on the top of a can?
Derive an expression relating effluent concentration to influent concentration, hydraulic residence time, and the reaction rate constant for a zero order reaction in a CSTR at stead-state.
water flows through a pipe of diameter 3 inches. If it is desired to use another pipe for the same flow rate such that the velocity head in the second pipe is four times the velocity of the first pipe.determine diameter of pipe
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd