Reference no: EM13895166
You are running a blood bank. Every month, a random number of hospital patients will need blood that you will supply. Also, every month, a random number of donors will come in and give blood. You goal is to provide enough blood on hand to supply those patients who need it.
At the beginning of the current month you have no pints on hand. Your forecast for this month predicts that the number of pints needed by patients, denoted by N for needed, is normally distributed with mean 35 and standard deviation 8.
Your forecast also predicts that the number of pints given by donors who will come in this month to donate blood, denoted by D for donated, is a normally distributed with mean 20 and standard deviation
The amounts of pints donated and required are assumed to be independent from one another.
If the amount of blood needed exceeds the amount of donated blood, the amount of blood you 'have' at the end of the month is negative representing the deficit. (For example if this month 25 pints donated and 30 pints needed, the amount of blood you have in your bank at the end of the month is 25 - 30 = -5 pints. In general, the amount of blood you have in you bank at the end of the month is D-N)
(a) What is the likelihood that the amount of the blood donated this month exceeds 45, i.e., Pr(D>45)?
(b) What is the probability distribution describing the amount of blood you have in your bank at the end of the month? Compute its mean and variance.
(c) What is the probability that you'll run out of blood by the end of the month, i.e., Pr(D-N<0)?
(d) If you don't run out of blood at the end of the month, you pay no additional cost. If you do run out of blood before the end of the month, you will pay a fixed cost of $1000 for an emergency shipment of blood (paying this flat fee will allow you to have all the pints of blood that you need).
You have the option of spending $100 on a marketing campaign, which will definitely bring in all the donors you need (but you don't want to spend this money if you don't need it).
Draw a decision tree describing the situation you're facing, calculate the EMV, and make a recommendation.
What should lovins do next with the hypercar concept
: What are the major obstacles to the successful introduction and launch of this new approach to designing and building cars? What should Lovins do next with the Hypercar concept?
|
Quality of purchased parts and components
: Acceptance sampling is a statistical method used to monitor the quality of purchased parts and components. To ensure the quality of incoming parts, a purchaser or manufacturer normally samples 20 parts and allows 1 defect.
|
Who should win the case - jones or wallsbury company
: A video camera aimed at the factory floor where U.S. Postage stamps are printed records what appears to be Murray, a line employee, stealing sheets of stamps from the production line. Based on the tape, factory officials search Murray's locker and..
|
The development of infrastructure plans
: What are the key parameters in the development of infrastructure plans? What is the role of growth? What is the level of integration between water, wastewater, and storm water infrastructure planning?
|
Calculating the emv
: You have the option of spending $100 on a marketing campaign, which will definitely bring in all the donors you need (but you don't want to spend this money if you don't need it). Draw a decision tree describing the situation you're facing, calcula..
|
Project - yuc intelligent system
: Project - YUC Intelligent System Interface Design Competition (Innovation and Creative System). Working in groups of 5 people (maximum), search any topic from internet to stimulate your idea and creativity
|
What single factor will impact all business more than is
: On the other hand, what single factor will impact all business more than IS? And, isn't knowl- edge and proficiency with IS and IT key to future employment and success?
|
The cost of capital for a firm that has no debt is called
: The cost of capital for a firm that has no debt is called the
|
Who eventually will pay costs of a poorly developed system
: What does this say about the need for your involvement in requirements and other aspects of systems development? Who eventually will pay costs of a poorly developed system? Against which budget will those costs accrue?
|