Suppose you are contemplating an investment project that has 2-phases. As currently planned, 1st phase of the project needs an investment of $100,000 today. One year from now, the project will deliver either $120,000 or $80,000, with equal probabilities. When these Phase I payouts occur, you will be able to invest an additional $100,000 in Phase II One year later, Phase II will pay out either 20 percent more than Phase 1 Actually delivered or else 20% less, again with equal probabilities.
You may commit to both phases at the start, or you may commit to Phase 1 (and postpone a decision on Phase II) or you may invest in neither. If you commit to both phases at the start, there is really no reason to delay. Suppose that you can choose in that case to implement both phases virtually simultaneously, so that both investments are made today and all payouts occur one year from now. (Note however that the size of the Phase II payout still depends on the size of the Phase 1 Payout. Conceptually, you can think of the Phase II payout as occurring immediately after Phase 1 Payouts.)
a. Using an expected payoff criterion, and discounting at 10 percent, which of the alternatives (First, Both or Neither) is the optimal decision?
b. What is the breakeven discount rate at which neither is a better decision than first?
c. Suppose you have access to an additional, similar investment that resembles the original but is more volatile: for the same initial investment, it delivers a Phase I return of + 40 percent (that is, either $140,000 or $60,000) with equal probabilities. Similarly, it delivers a Phase II return of +40 percent of the Phase I payouts, again with equal probabilities. Show that this new investment is preferable to the original, with a discount rate of 10 percent
d. Evidently, the higher volatility of the investment (+40 percent as opposed to + 20 percent) makes the potential cash flows attractive. With the discount rate at 10 percent, what levels of volatility would lead to an expected value above zero?
What is average number of customers in drive through area
: What is average length of "place order line". What is average length of "pick up line". What is average number of customers in drive through area.
|
Create incident response policy covers development-response
: Policy to reduce network down-time if future incidents happen. Create incident response policy which covers development of incident response team, disaster recovery process and business continuity planning.
|
Compute the firms gain or loss at sale
: The Weaver Watch firm sells watches for $25; fixed expenses are $140,000; and variable costs are $15 per watch.
|
What are the initial velocity, final velocity
: A pendulum bob of length L has its motion interrupted by the peg perpendicularly beneath the support. The bob is released when the string is horizontal. Find out the minimum value for y in order for the bob to swing in a complete circle. State thi..
|
Calculating breakeven discount rate
: Suppose you are contemplating an investment project that has 2-phases. As currently planned, 1st phase of the project needs an investment of $100,000 today.
|
What circumstances are constraints more important
: Under what circumstances is objective function more important than constraints in a linear programming model. Under what circumstances are constraints more important than objective function in a linear programming model.
|
Which has the largest normal force on the crate
: A wheel rotating about a fixed axis has an angular position given by q = 3- 2.0t3, where q is measured in radians and t in seconds. What is angular acceleration of the wheel at t = 2.00s.
|
Has the entropy principle been violated
: A 4.00 kg model rocket is launched, expelling 46 g of burned fuel from its exhaust at a speed of 590m/s. What is the velocity of rocket after the fuel has burned? Hint: overlook the external forces of gravity and air resistance.
|
How to maintain a constant acceleration
: Once free of this area, it speeds up to 13 m/s in 8 {rm s}. At the edge of town, driver again accelerates, with the same acceleration, for another 16 {rm s} to reach a higher cruising speed.
|