Calculate the water/cement ratio of the cement paste in which all the cement will hydrate to leave no capillary pores. (density of cement: 3.1 g/cm3) ?
The void ratio of soil in the borrow pit is 1.12. Estimate the volume of soil (cubic meters) that must be excavated from the borrow pit.
Determine the rate at which heat is added in the boiler, the power required to operate the pumps, the net power produced by the cycle, and the thermal efficiency.
A ten-foot high wall will retain a medium dense sand backfill. Determine the Rankine earth pressure diagram and the total active force on the wall.
Assuming unit surface area, find the conductive heat loss through the furnace wall and the temperature at the interface of the fire clay and red brick.
In what direction did the cue ball move after the collision? What percentage of its kinetic energy did the cue ball impart to the eight ball?
It is required to dewater a construction site 80 m by 80 m. The bottom of the construction will be 1.5 m below the initial water surface elevation of 90 m.
If the engine is mounted solidly on a rigid foundation, what is the alternating force amplitude transmitted? Assume the connection rod to be of infinite length.
Whether the wall has adequate sliding resistance and whether the wall is safe against over-turning
Presedimentation can reduce the suspended solids concentration of raw river water from 500 mg/L to 200 mg/L. How many pounds of dry solids does this represent per million gallons?
Calculate the undrained shear strength at a depth of 120 ft below the mudline. Calculate the undrained shear strength at a depth of 120 ft below the mudline if the soil has an OCR of 2.5 .
If the queue clears exactly at the end of the effective green D/D/1 queuing applies, determine the total vehicle delay in the cycle (in veh-sec) .
A simple curve has a central angle of 42 degreess. A point Y is located 24m from the vertex and has a perpendicular distance of 3.00m from the back tangent.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd