Reference no: EM13962787
Manufacturing standard cost sheets
One of your clients, Moore Manufacturing has asked you to assist them in evaluating their performance against their budgets. The management of Moore Manufacturing has provided the following standard cost sheet for one of its products:
Direct Materials |
6 lb @ $2 per pound |
$12 |
Direct Labor |
3 hrs @ $25 per hr |
$75 |
Variable factor overhead |
2 hrs @ $4 per hour |
$8 |
Fixed factory overhead |
2 hr @ $15 per hour |
$30 |
Cost per unit |
|
$125 |
Moore Manufacturing applies factory overhead based on direct labor hours and factory overhead is allocated based on a practical capacity of 500 units of product.
The actual operating results for the year are as follows:
Units manufactured |
|
400 |
Direct materials purchased and used |
1,800 pounds |
$19,800 |
Direct labor incurred |
750 hours |
20,250 |
Variable factory overhead incurred |
|
5,000 |
Fixed factory overhead incurred |
|
15,800 |
Determine the following for the period:
Flexible budget for variable overhead based on output for the period
Total variable overhead applied to production during the period
Total budgeted fixed factory overhead
Total fixed factory overhead applied to production during the period
Calculate the following variances using four-variance analysis:
Total variable overhead variance
Variable overhead spending variance
Variable overhead efficiency variance
Total under applied or over applied variable overhead
Fixed overhead spending variance
Production volume variance
Total fixed overhead variance
Total under applied or over applied fixed overhead
Calculate the following variances using three-variance analysis:
Factory overhead spending variance
Factory overhead efficiency variance
Production volume variance
Calculate the total overhead flexible budget variance and the production volume variance using a two-variance analysis.
Part Two:
In a 750 word document, explain to the management team at Moore Manufacturing about the variances and evaluation of their performance
What questions do you have about apa format and style
: What questions do you have about APA format and style? Where might you search for answers to these questions? What steps will you take to ensure that the work you submit meets APA format and style expectations? (This response does not require researc..
|
Best mix of large and small globes
: Your company works 1 shift, 40 hours per week, 40 hours for the kiln and 40 hours for the spray paint equipment. Plot the constraints. Show the feasible region. What is the best mix of large and small globes to make the most profit?
|
Research paper on port facility operations and security
: You are to prepare a research paper (Times New Roman, Font 12-double space) on Port Facility Operations and Security using APA style format
|
What strategy should you pursue in the bond market
: What strategy should you pursue in the bond market to position yourself to profit from your beliefs?
|
Calculate the total overhead flexible budget variance
: Calculate the total overhead flexible budget variance and the production volume variance using a two-variance analysis.
|
What are the main planning tasks performed
: How does having a scope and WBS help project teams during project execution? Why is it difficult to develop good plans - Name the main planning tasks performed as part of project integration management
|
What is the ratio of the speed of the water flowing
: A meter long hose of 14cm diameter is connected to a second hose which is 4 meters long and 7cm in diameter. At the open end of the second hose water flows out at a rate of 8 cm^3/sec. What is the ratio of the speed of the water flowing in the se..
|
Who wrote the plan - the virginia plan
: In this assignment you will summarize the major plans that impacted the creation of the Constitution: The Virginia Plan and The New Jersey Plan, Who wrote the plan? Who benefited from the plan? What specific powers will the congress have
|
How far would the water disperse the larger mass of the pool
: A long lance 38mm ID mounted vertically into a pool the last 300mm of the lance is bent 45 deg, so the end of the lance is 305mm above the pool floor. Would fitting a nozzle or several small nozzles to the lance head improve the dispersal rate?
|