Calculate the temperature of flat world that has an albedo

Assignment Help Civil Engineering
Reference no: EM13306170

a)The GWP 100 for methane is 25 and US methane emissions are 5 MMt per year.What id this in term of co2 equivalent emissions:CO2e?

b). Calculate the temperature of "flat world" that has an albedo of 0.31 and a solar flux of 1370 w/m^2. One side of flat world faces the sun. Ignore energy emitted from the edge of flat world.

Reference no: EM13306170

Questions Cloud

How are the inputs transformed into the outputs : Explain how the table below works, i.e., what are the inputs, what are the outputs, and how are the inputs transformed into the outputs and explain how the investment in working capital changes (compared to the amount in Q2a) and why.
Write a few lines of code to create a timer in java : Write a few lines of code to create a timer in Java which fires an ActionEvent every 150 msec. Assume the existence of a TimerEventHandler class which needs to respond to timer events.
Obtain the specific heat of the metal : The specific heat of a certain metal can be determined by measuring the temperature change that occurs when a piece of the metal is heated, What is the specific heat of the metal
What interface does an application need to use : What interface does an application need to use if it wants to get updates on the current position of the mouse cursor as the mouse is being moved? How does the program get the x,y coordinates of the mouse cursor?
Calculate the temperature of flat world that has an albedo : Calculate the temperature of "flat world" that has an albedo of 0.31 and a solar flux of 1370 w/m^2. One side of flat world faces the sun. Ignore energy emitted from the edge of flat world.
What window events can a program handle : What window events can a program handle? Explain the difference between the WindowListener interface and the WindowAdapter.
What is the paintcomponent method : What is the paintComponent method? How is it used in Java graphics? How does a program intentionally cause the paintComponent method to execute?
What is the period of the oscillator : A simple harmonic oscillator takes 26 seconds to undergo 22 complete oscillations. What is the period of the oscillator
Draw a magenta circle : Given a graphics object g, write a few lines of code to have that graphics object draw a magenta circle (not filled in) that has a diameter of 200 pixels.

Reviews

Write a Review

Civil Engineering Questions & Answers

  What is the probability that the paper has either a 3 or a 6

suppose there are 10 pieces of paper in a hat. Each piece of paper has a digit 1 through 10 written on it. Each number is written only once. You reach in the hat and select a piece of paper. What is the probability that the paper has either a 3 or..

  Determine the maximum shear stress at the end

A 600 mm long solid steel shaft is to transmit a torque of 30 N-m, G=90 GPa, diameter 15mm. Determine (a) Maximum shear stress, and (b) Angle of twist (phi) at the end.

  What textbooks are used and required

What textbooks are used and required for CIVE 205, MECH 289, CIVE 290, EPSC 221 and MATH 263 at McGill?

  Find what was the temperature t of water evaporated

After the copper mass is added, the final temperature of the mixture is 38 degrees Celsius. By checking the mass, it is determined that 1.2 grams of water evaporated. What was the temperature T

  Compute the maximum acceptable service load

Compute the maximum acceptable service load on an A36 steel plate tension member 1/4in.x12in. having a single line of holes parallel to the direction of loading. The load is 25% dead load and 75% live load, and 7/8in. diameter bolts are used.

  What the meaning of steady state

could you please help me to figure out what the meaning of steady state in the pavement management system preservation and rehabilitation.

  Find the total length of pipe that must pass through furnace

The boiling water passes through copper pipes that have a wall thickness of 4 millimeters and a surface area of 0.12 square meters per meter length of the pipe. Find the total length of pipe (there are actually many pipes in parallel)

  Draw elevation, plan and development of the lateral surfaces

Axis of the hole is perpendicular to VP. Draw elevation, plan and development of the lateral surfaces of the pyramid.

  Compute semiannual coupon payment investor will receive

If, on 8/1/2019, 3-year municipal bonds with an AA- rating and a coupon rate of 6.50% (payable semiannually) are selling for $100.00, what would be the fair market value of the 300 Whittier bonds (not including the 8/1/2019 coupon payment)

  What is the minimum length of the vertical curve

A tow truck is searching a city street at 30 mi/h for illegally parked vehicles. It travels over an equal tangent vertical curve with an initial grade of +3.5% and final grade of -4.0%.

  Estimate how long it will take before the daily maximum

Estimate the steady state PM10 concentration assuming a PM10 deposition velocity of 0.12 cm/s, prevailing wind velocity of 2.5 m/s, and a constant emission flux of PM10 0.82 mg/m2-s.

  Find apparent settling velocity for the phosphorus in lake

The only losses of total phosphorus for the lake are settling and fluching throught the lake's outlet. Assume the outflow rate is 212 km^2/year and the sediment area is 10,500 km^2.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd