Calculate the stress in a No. 7 rebar subjected to a tensile load of 10,600 lb (in ksi).

Reference no: EM13307010

Questions Cloud

How far did the object travel : The velocity vs time graph of an object is approximated by a triangle which starts at v=0 at t=0, rises to a maximum of v=6 m/s at t=6 sec, then returns to zero at t=10 sec. How far did the object travel?
What would be a safe horizontal seperation for the fly : Archer fish often prey for flies that hover above the water. The index of refraction of water is 1.33. what would be a "safe" horizontal seperation for the fly
Find the acceleration of a forklift of mass : Find the acceleration of a forklift of mass 1400 kg pushed by a force of 2100 N that is opposed by a frictional force of 425 N.
Find the deepest value in a binary tree in c++ : How do you find the deepest value in a binary tree in C++?
Calculate the stress in a rebar subjected to tensile bar : Calculate the stress in a No. 7 rebar subjected to a tensile load of 10,600 lb (in ksi).
Calculate the energy needed to accelerate a spaceship : Calculate the energy needed to accelerate a spaceship with a mass m = 25 × 103 kg toa speed of 0.40c. Compare this number with the approximate annual energy usage ofEarth, 1021 J
Find how much existing highway must be reconstructed : The overpass structure is to be level, centered 26 feet above the railroad, and 180 feet long. How much existing highway (in feet) must be reconstructed to provide appropriate vertical alignment
The crate is sliding down the ramp : 1)A crate of potatoes of mass 19.0 kg is on a ramp with angle of incline 30° to the horizontal. The coefficients of friction are μs = 0.82 and μk = 0.29. Find the frictional force (magnitude and direction) on the crate if the crate is sliding d..
Find how much time passes before the ice starts to melt : An open container holds ice of mass 0.595kg at a temperature of -13.5 celcius . The mass of the container can be ignored. How much time passes before the ice starts to melt

Reviews

Write a Review

Civil Engineering Questions & Answers

  Define holographic mobile phones

A young engineer has invented holographic mobile phones and has approached a venture capital company to invest in it. The venture capital company considers the product to be an all or nothing product

  Estimate the rate of heat transfer from the compressor

50 kmol per hour of air is compressed from p1 = 1.2 bar to P2 = 6.0 bar in a steady-flow compressor. Delivered mechanical power is 98.8KW. Temperature and velocities are: T1= 300K T2= 520K u1= 10m s^-1 u2= 3.5m s^-1

  Design the roof slab as a one-way slab system

Design the roof slab as a one-way slab system and use the worst case design scenario to determine the reinforcing for the entire roof

  Estimate the et losses for the area in inches and centimeter

The discharge of the river at the basin outlet is measured at an avarage of 650 cfs. assuming that the charge in storage for the system is essentially zero, estimate the ET losses for the area in inches and centimeters for the year

  How does the combination work for band pass or band stop

A low pass filter has a cut-off frequency of 5 kHz and a high pass filter has a cut-off frequency of 8 kHz. These two circuits are connected back to back in cascade to form an input-output system

  What is the probability that gas and oil will be short

A community has three major sources of power supply: electricity, gas and oil. Let E, G and O denote events of shortages of each of these power sources, respectively. Their probabilities are estimated to be 0.15, 0.10 and 0.20 respectively.

  How much will e85 fuel have to cost to make flex-fueled car

One blend that is gaining popularity is E85, which is 85% ethanol and 15% gasoline. E85 is 80% cleaner burning than gasoline alone, and it reduces our dependency on foreign oil. But a flex-fueled car costs $1,000 more than a conventional gasoline-..

  Determine the minimum height on the wall from hose

Determine the minimum height on the wall to which the firefighter can project water from the hose, so that the water strikes the wall horizontally. The speed of the water at the nozzle is Vc=48ft/s.

  Find dimension of rectangular concrete channel to carry flow

Find the dimensions of a rectangular concrete channel to carry a flow of 150 m3/s, with bottom slope 0.015, and mean velocity 10.2 m/s.

  Explain plan for construction of a small child care center

describe how would you develop a subcontracting plan for the construction of a small child care center

  Find what pressure gradient is required to accelerate water

What pressure gradient is required to accelerate water vertically upward in a vertical pipe at a rate of 0.5g

  What percentage of the water evaporates

Saturated liquid water at 1.0 MPa is throttled adiabatically to a pressure of 0.4 MPa. If the change is kinetic energy is negligible, what percentage of the water evaporates during this throttling process?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd