The system has an average of two failures in a year. Every failure will make the system unavailable for three to four hours before the system is being recovered. I want to calculate the reliability in presence of these two failure taking in account that the failures are randomly distributed. Failure =0 so the repairing period and the operating hours =1.

I want to enter the data hourly, this means the input string of the load curve readings has 8736 value. The load curve reading rang is between 0 and 1 and I will attach a file to explain how the load curve readings look like.

The second simulation is after adding the wind or/and solar energy to reduce the failure effect and reduce the power outage duration (for example, for every failure I have 4 hours outage, with the use of solar/wind energy the duration will be 1 hour).

To sum the points:

1. Reliability of the system with no failure.

2. Reliability of the system with two failures.

3. Reliability of the system after improving the system using the renewable energy sources.

For the MonteCarlo simulation, it is better to use the Weibull or Exponential distributions.

I have to enter the data for :

1- Load curve readings string (for 8736 Hour).

2- Operating and failure string should be generated automatically by the Matlab code (for 8736 hours) with two failures, four hours duration for each

3- The power rating of the renewable energy sources. This will be subtracted from the power ratings of the transformers ratings of the system to reduce the pressure on the power station.

Reference no: EM13868834

Questions Cloud

Discuss health information portability act : Discuss the Health Information Portability and Accountability Act of 1996 (HIPAA) and the impact it has had on the exchange of data that includes health-related patient information
How restrictions on private ?nancial account transactions : How might restrictions on private ?nancial account transactions alter the problem of attaining internal and external balance with a ?xed exchange rate? What costs might such restrictions involve?
The village accepted the shipment and the invoice : The village accepted the shipment and the invoice Prepare journal entries to record these transactions in the General Fund.
How such a revaluation crisis or in?ow attack might operate : Can you describe how such a "revaluation crisis" or "in?ow attack" might operate when the government (like Germany's at the time) is highly fearful of in?ation?
Calculate the reliability in presence : I want to calculate the reliability in presence of these two failure taking in account that the failures are randomly distributed. Failure =0 so the repairing period and the operating hours =1.
What would be the effect on the ending actual fund balance : What would be the effect on the ending actual fund balance, assuming the following Actual revenues are equal to estimated revenues, and actual expenditures are $ 7,000 less than appropriations
Show the location of the chinese economy on a diagram : Show the location of the Chinese economy on a diagram. What would be your advice on how the authorities should move the renminbi's exchange rate?
Examine effect of a one-time rise in the foreign price level : Use the DD-AA model to examine the effects of a one-time rise in the foreign price level, P*. If the expected future exchange rate Ee falls immediately in proportion to P* (in line with PPP).
Is sleepy hollow projecting a budgetary surplus : Is Sleepy Hollow projecting a budgetary surplus or a deficit for 2013? Prepare the journal entry to record the 2013 budget.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Engineering ethics and ethical issue

what is the engineering ethics course where to write about any engineering ethical case and discuss the ethical issue?

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Transportation and management

In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.

  Supporting Investment Promotion: ERNST & YOUNG

Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.

  Personalized Cancer Therapy-A step forward

Cancer is the uncontrolled growth of abnormal cells in the body resulting in tumours that can be benign or malignant (cancerous cells). A proper treatment is necessary to fight with this serious disease.

  Discuss the different environmental companies

Discuss the different agencies, institutes, centers, different environmental companies that are active in UAE.

  Develop a simple urban constructed wetland design

Develop a simple urban constructed wetland design.

  Evaluate company performance in relation to GRI standards

Evaluate company performance in relation to GRI standards and comment on Stigler's theory.

  Water system design

Determine the corresponding error in the computed discharge

  Hydraulic behaviour in open channel

Describe how test flumes and associated equipment are used to assess and confirm hydraulic behaviour in open channel

  Write a paper on steel sustainability

Write a paper on steel sustainability.

  Writing case study about bridge collapse

Writing case study about bridge collapse

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd