Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
The segment of river shown has a rectangular cross-section, with width 50 ft. The river bed is at angle theta=10 degrees from horizontal. The average velocity is 2 ft/s at the upstream end, and 3 ft/s at the downstream end. The vertical depths are as follows: delta_Z1= 4 ft and delta_Z2 =3:5 ft. Fresh water is owing at a temperature of 60 degrees F.Find:a)Find mass flow rate (m=roeV*A) at control sections 1 and 2b)Calculate the rate of change of water mass in the segment.
A company borrowes $25000 at an interest rate of a nominal 16% per year compounded quarterly. The company desires to repay the loan in 36 equal quartely payments, with the first payment starting three months from now.
How do the crack behaves under the compression of a concrete cubes under friction between the plates and specimen with stress strain diagram?
Should Bernard bid for the project assignment? Why or why not? Does Bernard have an unfair advantage over firms having designed the project on which he wants to bid?
a cylindrical specimen of a metal alloyed in stressed in compression. If its original and final diameters are 40.00 and 40.10 mm, respectively , and its final length is 120.00 mm, compute its original length(L0)
How to draw bending moment diagram for this shape and the value of the moment in critical sections assume that the distributed load (w) KN/M and the concentrated load
Write a program that uses menu to select a type of figure (triangle, sqaure, pentagon, hexagon, heptagon, octagon), and then use switch-case to determine the value of n.
a saturated 100 cm^3 clay sample has a natural water content of 30 percent. it is found that the shrinkage limit occurs when the water content is 19 percent. if the specific gravity of soil solids is 2.70
Pore water pressure is to be observed during the construction of the embankment. Calculate the pore water pressure which must not be exceeded at any point in the clay layer 9 m below the surface of the embankment to ensure a shear strength of 100 ..
If the elevation of the pipeline at the treatment plant is 125 m, estimate the pressure in the pipeline 1 km downstream where the elevation if 110 m. Hint: Use the Colebrook equation to estimate f, and the energy equation to estimate P2 .
Consider two alternative water resource projects, A and B. Project A will cost $2,533,000 and will return $1,000,000 at the end of 5 years and $4,000,000 at the end of 10 years.
Calculate the elongation of a steel bar 4 feet in length and 4 inches in diameter when subjected to a force of 2.5 kips. Assume that the bar remains in the elastic region with E=30 ksi.
If the peak-hour factor is .90 and all of the drivers are regular users, what is the level of the service of this compound-grade freeway segment?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd