Calculate the pressure at the clay-sand interface for two

Assignment Help Civil Engineering
Reference no: EM13533443

A clay lense of Kc=0.10cm/day is sandwiched somewhere inside avertical soil column of height 100cm that is otherwise filled withsand of Ks=200cm/day. A depth of water d=10cm is ponded abovethe surface.

a. If the actual flux rate is Jw = -15cm/day, how thick is the claylense?

b. Calculate the pressure at the clay-sand interface for two cases:1) clay on top of the sand and 2) clay on the bottom of thevertical sand column.

Reference no: EM13533443

Questions Cloud

Operated as a two-way street with parking permitted : Determine the service flow rate with a level of service B for asection of 4-lane freeway (2 lanes in each direction) with 10-ftlanes and obstructions 4 feet from the traveled pavement on oneside of the roadway. The section has a 5% grade 0.95 miles l..
Find the magnitude of the velocity at t=30 seconds : A motorcycle starts from rest at time t=0. The force on it from t=0to 30 seconds is F=300-9t. The combined mass of the motorcycle andthe rider is 225 kg. Use the Impulse and Momentum method to find the magnitude of the velocity at t=30 seconds.
The corresponding increase in the diameter of the vessel : A spherical gas container having an outer diameter of 15 ftand a wall thickness of 0.90 in. is made of a steel for whichE =29*106 psi and v = 0.29. Knowingthat the gage
Determine the corresponding height of capillary rise in soil : The void ratio of a given soil A is twice that of another soil B,while the effective size of particles of soil A is one-third thatof soil B. The height of capillary rise of water in soil A on acertain day is found to be 400 mm. Determine the correspo..
Calculate the pressure at the clay-sand interface for two : Calculate the pressure at the clay-sand interface for two cases:1) clay on top of the sand and 2) clay on the bottom of thevertical sand column.
What is the maximum torque the tube can transmit if the : A thin tube of 1/8 in thickness has a mean diameter of 6 in. What is the maximum torque the tube can transmit if the allowable normalstress in compression is 10 ksi?
Find the rate that the trucks line up : A container ship carries 2000 units. It must be unloaded andre-loaded in a 48 hr turnaround. Two cranes are available. Find the rate that the trucks line up, load and pass under each crane.
Calculate the diameter of this pipe : Using the Hazen-Williams approach (seecoefficient table below), find the headloss of water flowingthrough 1,000-ft of 6-ft diameter concrete pipe at a flow rate (Q)of 80 ft3/sec
What is the oil flowrate in stb : Two wells had been drilled on 40-acre spacing. Well 1 is injectionand Well 2 is producing well. Downhole injection pressure is 8500psi, and bottomhole pressure in producing well is 2400 psi.

Reviews

Write a Review

Civil Engineering Questions & Answers

  How many pounds of bod are destroyed by the plant each day

A wastewater treatment plant produces 34, 500 pounds of secondary sludge each day. Wastewater flows into the plant at a rate of 5.6 MGD and has an influent BOD of 325 mg/L. How many pounds of BOD are destroyed by this plant each day

  Determine what is the irr of the system

If the system needs $5000 in operating and maintenance costs each year and has a salvage values of $25,000 at Year 10, what is the IRR of this system. If the company wants to earn at least 12% on all investments

  How much does she get to keep after paying off the loan

A year after buying her car, Anita has been offered a job in Europe. Her car loan is for $15,000 at a 9% nominal interest rate for 60 months. If she can sell the car for $12,000, how much does she get to keep after paying off the loan

  What is the isentropic efficiency of the compressor

An adiabatic argon unit compresses argon at 200 kPa and 27C to 2.18 MPa. If the Argon leaves this compressor at 513C. What is the isentropic efficiency of the compressor

  Find principle stresses, max shear stress at a cross section

find principle stresses, max shear stress at a cross section 2 ft from the left of each locations: a) neutral axis, b) 2in. above neutral axis, c) the top of the beam.

  Develop preliminary wbs for small one-story to be construct

The exterior and interior walls are of concrete block. The roof is constructed of bar joists covered with a steel roof deck, rigid insulation, and built-up roofing.

  What is the concentration of nh3of household ammonia

What is the concentration of NH3 (in mg/L) of household ammonia that contains 3.00 percent by wieght of NH3. Assume the density of water = 1000kg/m^3

  Compute relative compaction based on modified proctor test

sand cone test has been performed . The test results: intial weight of cone + sand =13.51lb, Final weight of sand cone + sand= 4.26lb, weight of sand to fill cone=2.12lb, weight of soil from hole+bucket=12.42lb, weight of bucket=1.21lb

  How long would it be before company could sell the property

A multinational engineering consulting firm that wants to provide resort accommodations to certain clients is considering the purchase of a three-bedroom lodge in upper Montana that will cost $250,000.

  What is the definition of a customer what are some examples

what is the definition of a customer? what are some examples of internal and external customers? is the measurement of

  Compute the new thickness of sand over extra strata

A 1.20-m thick strata of sand has a void ratio of 1.81. A contractor passes a vibratory roller over this extra strata, which densifies it and reduces its void ratio to 1.23. Compute its new thickness.

  Find the final temperature and the amount of work

Air can be assumed as a di-atomic ideal gas. Find the final temperature and the amount of work ( in kW) required for air compression at a rate of 100 mol/s , from an initial condition of 1 bar an 25 C to 10 bar; for the following ways.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd