Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Problem - Neptune Inc. manufactures steal structures to civil engineering companies. Neptune's factory has three production departments and the table below shows the estimated manufacturing overhead, direct labor-hours and machine-hours for each department.
Cutting
Drilling
Assembling
Manufacturing overhead (estimated)
R$504.000,00
R$2.304.000,00
R$2.736.000,00
Direct labor-hours (estimated)
60.000h
96.000h
144.000h
Machine-hours (estimated)
960.000h
480.000h
360.000h
The order request no. 101 has spent the following direct labor hours and machine hours:
Direct labor-hours
2.000h
2.500h
3.000h
Machine-hours
20.000h
Required -
(a) Using the concepts of absorption costing by the job-order costing method (i.e., not considering departments when assigning costs), calculate the predetermined overhead rate using the direct labor-hour as the allocation base. Next, assign the manufacturing overhead to the order request no. 101.
(b) Using the concepts from process costing (i.e., considering departments when assigning costs), calculate the predetermined overhead rate using machine-hours as the allocation base for the cutting department and direct labor-hours as the allocation base for the drilling and assembling departments. Next, assign the manufacturing overhead to the order request no. 101.
(c) Compare the results obtained from items (a) and (b) and explain why Neptune Inc. should choose either the job-order costing or the process costing.
Hubbard argues that the Fed can control the Fed funds rate, but the interest rate that is important for the economy is a longer-term real rate of interest. How much control does the Fed have over this longer real rate?
Coures:- Fundamental Accounting Principles: - Explain the goals and uses of special journals.
Accounting problems, Draw a detailed timeline incorporating the dividends, calculate the exact Payback Period b) the discounted Payback Period. the IRR, the NPV, the Profitability Index.
Term Structure of Interest Rates
Write a report on Internal Controls
Prepare the bank reconciliation for company.
Create a cost-benefit analysis to evaluate the project
Theory of Interest: NPV, IRR, Nominal and Real, Amortization, Sinking Fund, TWRR, DWRR
Distinguish between liquidity and profitability.
Your Corp, Inc. has a corporate tax rate of 35%. Please calculate their after tax cost of debt expressed as a percentage. Your Corp, Inc. has several outstanding bond issues all of which require semiannual interest payments.
Simple Interest, Compound interest, discount rate, force of interest, AV, PV
CAPM and Venture Capital
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd