Calculate the predetermined overhead rate

Assignment Help Finance Basics
Reference no: EM131356959

The Genre company is the manufacturer of two products the Basic and the Advanced .Details of production data and product cost data are as follows:

Basic Advanced
Direct material
40 60
Direct labour
2 hours 3 hours
Manufacturing overhead
2 hours 3 hours
Direct labour cost per hour
$15 per hour $15 per hour
Production
2000 units 10000 units

Manufacturing overhead has traditionally used direct labour hours to calculate the predetermined overhead rate.

The Manufacturing overhead budget is as follows:
Set up costs
$360,000 Engineering costs
180,000
Machine related costs
900,000
Plant related costs
192,000
Total
$1,632,000

The Genre company has traditionally priced its products at 120 per cent of manufacturing cost.

Recently the Genre company has found it has had difficulty selling its advanced product with a competitor entering the market from overseas and making substantial sales at a price considerably below Genre's price for the Advanced product.

The CEO of Genre ,Jane Monk, cannot understand how this could be and has asked you to investigate the matter.You start to examine some of the data and decide to check out a new approach to allocate costs called Activity Based Costing. You have managed to identify the following information:

Activity Cost Pool Cost Driver
Budgeted level of Cost Driver
Set up costs Number of production runs
Set up costs 80 runs Number of production runs
Engineering costs Engineering changes
200 engineering changes
Machine related costs Machine hours 18,000 hours
Plant related costs 3,840 sq ft Floor space in sq ft

In addition the following information has been determined
- -The Basic product is manufactured in production runs of 50 units each and the Advanced product is manufactured in 250 unit batches
- -75% of the engineering changes are used by the Basic product with the remaining 25% used by the Advanced product
- -Each Basic product requires 4 machine hours whereas each Advanced product requires 1 machine hour
- -The plant has 3,840 square feet of floor space with 80% of it used in the production of the Basic product

Required:
Using the information above and your knowledge of Activity Based Costing you are required to provide answers to the following :

(a) Calculate the predetermined overhead rate that would be used under traditional overhead costing

(b) Calculate the product cost per unit for the Basic and Advanced products under traditional costing

(c) Calculate the price that would be charged for the Basic and the Advanced products under traditional costing

(d) Calculate the cost per Activity for each cost pool. ( e) Calculate the cost per unit for Basic and Advanced products using Activity Based Costing


In addition the following information has been determined :
- -The Basic product is manufactured in production runs of 50 units each and the Advanced product
is manufactured in 250 unit batches
- -75% of the engineering changes are used by the Basic product with the remaining 25% used by the

Advanced product
- -Each Basic product requires 4 machine hours whereas each Advanced product requires 1 machine hour
- -The plant has 3,840 square feet of floor space with 80% of it used in the production of the Basic product

Required:

Using the information above and your knowledge of Activity Based Costing you are required to provide answers to the following :

(a) Calculate the predetermined overhead rate that would be used under traditional overhead costing

(b) Calculate the product cost per unit for the Basic and Advanced products under traditional costing

(c) Calculate the price that would be charged for the Basic and the Advanced products under traditional costing

(d) Calculate the cost per Activity for each cost pool. ( e) Calculate the cost per unit for Basic and Advanced products using Activity Based Costing

(f) Based on your calculations with respect to Basic and Advanced products comment upon whether either product has been overcosted or undercosted

(g) Discuss the benefits that can be obtained from using an Activity Based Costing system and whether it would be useful in costing the current products

Verified Expert

The said paper consist of calculation and comparison of cost of product calculated under single OH rate method and ABC method. Here overhead cost under both the situation has been calculated and compared to predict the final result

Reference no: EM131356959

Questions Cloud

Example of flexibility option : Which one of the following is an example of a "flexibility" option?
What is the bottleneck time : A production process at Kenneth Day Manufacturing is shown in Figure. The drilling operation occurs separately from, and simultaneously with, sawing and sanding, which are independent and sequential operations. What is the bottleneck time
Explain which approaches you would be most comfortable using : Identify the six possible approaches to the way in which the design work can be organized. Explain which approaches you would be most comfortable using.
Compute the? bond yield to maturity : ?(Bond valuation? relationships) The 17?-year, ?$1,000 par value bonds of Waco Industries pay 7 percent interest annually. The market price of the bond is ?$1,135?, and the? market's required yield to maturity on a? comparable-risk bond is 4 percent...
Calculate the predetermined overhead rate : Calculate the predetermined overhead rate that would be used under traditional overhead costing - Calculate the product cost per unit for the Basic and Advanced products under traditional costing
Create the structure for the records in the customer file : Create the "structure" for the records in the customer file. Use given Figure as a general guide to the data elements to be included in the customer records. However, observe the following specific requirements:
How the selected company can establish hrm strategies : Determine which HR job positions you would prefer and explain why. Analyze how the selected company can establish HRM strategies to improve competitive advantages.
What is the throughput time of the new work cell : The Pullman Mfg., Inc., three-station work cell illustrated in Figure has two machines at station 1 in parallel. What is the throughput time of the new work cell? What is the bottleneck time of the new work cell
What must the risk-free rate be : A stock has an expected return of 15.9 percent, a beta of 1.70, and the expected return on the market is 10.10 percent. What must the risk-free rate be?

Reviews

inf1356959

1/21/2017 3:29:31 AM

Hi, I simply need to state thank you SO especially for your offer assistance! I got full blemishes on the task, and I have been prescribing your service to a couple people as of now. I am so cheerful I ran over your site, and I will utilize your administrations again sooner rather than later! Much thanks to you once more, to everything - your work is eminent!

len1356959

1/17/2017 5:16:31 AM

I got an assignment for you, Can you solve part( c,d,e,f,g) for me. Can you please tell me the charges for this. Thank you Calculate the predetermined overhead rate that would be used under traditional overhead costing

Write a Review

Finance Basics Questions & Answers

  Financial reporting and analysis

Finance is about Gunns Ltd, a company in dealing with forestry products in Australia. The company has also been listed in Australian Stock Exchange. As many companies producing forestry products, even Gunns Ltd is facing various problems. Due to the ..

  A report on financial accounting

This report is specific for a core understanding for Financial Accounting and its relevant factors.

  Describe the types of financial ratios

Describe the types of financial ratios and other financial performance measures that are used during venture's successful life cycle.

  Differences between sole proprietorship and corporation

Briefly describe the major differences between a sole proprietorship and a corporation

  Prepare a cash budget statement

Calculate the expected value of the apartment in 20 years' time. What is the mortgage loan repayment at the beginning of each month

  What are the implied interest rates

What are the implied interest rates in Europe and the U.S.?

  State pricing theory and no-arbitrage pricing theory

State pricing theory and no-arbitrage pricing theory

  Small business administration

Identify the likely stage for each venture and describe the type of financing each venture is likely to be seeking and identify potential sources for that financing.

  Effect of financial leverage

The Effect of Financial Leverage and working capital management

  Evaluate the basis for the payment to the lender

Evaluate the basis for the payment to the lender and basis for the payment to the company-counterparty.

  Importance of opps, ipps, mpfs and dmepos

Research and discuss the differences and importance of : OPPS, IPPS, MPFS and DMEPOS.

  Time value of money

Time Value of Money project

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd