Reference no: EM13949389
Airepart, Inc., produces two different types of subassemblies for the aircraft industry. Airepart produces a major component for the subassemblies in the cutting and welding department. Other parts and the manufactured component are then assembled in the assembly department. The activities, expected costs, and drivers associ- ated with these two manufacturing processes are as follows:
Process
|
Activity
|
Cost
|
Activity Driver
|
Expected Quantity
|
Cutting and
|
Welding
|
$ 2,000,000
|
Welding hours
|
4,000
|
Welding
|
Machining
|
1,000,000
|
Machine hours
|
10,000
|
|
Inspecting
Materials handling
|
70,000
52,000
|
No. of inspections
No. of moves
|
1,000
12,000
|
|
Setups
|
400,000
|
No. of batches
|
100
|
|
|
$3,522,000
|
|
|
Assembly
|
Changeover
|
$ 28,000
|
Changeover hours
|
1,000
|
|
Rework
|
50,000
|
Rework orders
|
50
|
|
Testing
|
40,000
|
No. of tests
|
750
|
|
Materials
handling Engineering support
|
60,000
70,000
|
No. of parts
Engineering hours
|
50,000
2,000
|
|
|
$ 248,000
|
|
|
Note: In the assembly process, the materials handling activity is a function of product characteristics rather than batch activity.
Other overhead activities, their costs, and drivers are as follows:
Activity |
Cost |
Activity Driver |
Quantity |
Purchasing
|
$50,000
|
Purchase requisitions
|
500
|
Receiving
|
70,000
|
Receiving orders
|
2,000
|
Paying suppliers
|
80,000
|
No. of invoices
|
1,000
|
Providing space and utilities
|
30,000
|
Machine hours
|
10,000
|
|
$230,000
|
|
|
Other production information concerning the two subassemblies is also provided as follows:
|
Subassembly A |
Subassembly B
|
Units produced
|
1,500
|
3,000
|
Welding hours
|
1,600
|
2,400
|
Machine hours
|
3,000
|
7,000
|
Inspections
|
500
|
500
|
Moves
|
7,200
|
4,800
|
Batches
|
45
|
55
|
Changeover hours
|
540
|
460
|
Rework orders
|
5
|
45
|
Tests
|
500
|
250
|
Parts
|
40,000
|
10,000
|
Engineering hours
|
1,500
|
500
|
Requisitions
|
425
|
75
|
Receiving orders
|
1,800
|
200
|
Invoices
|
650
|
350
|
The per-unit overhead costs using the 14 activity-based drivers are $1,108 and $779 for Subassemblies A and B, respectively.
Required
1. Determine the percentage of total costs represented by the three most expensive activities.
2. Allocate the costs of all other activities to the three activities identified in Requirement 1. Allocate the other activity costs to the three activities in proportion to their individual activity costs. Now assign these total costs to the products using the drivers of the three chosen activities.
3. Using the costs assigned in Requirement 1, calculate the percentage error using the ABC costs as a benchmark. Comment on the value and advantages of this ABC simplification.
Used as the annual sales figure when evaluating this project
: Travel America Coaches currently sells 15,000 motor homes per year at $94,000 each, and 1,500 luxury motor coaches per year at $159,000 each. The company wants to introduce a low-range camper to fill out its product line; it hopes to sell 3,000 of th..
|
Are these intervals more useful for planning your expansion
: Run a regression of sales against local income (only). Based on this regression, give an interval that you are 95% confident will contain your sales in a neighborhood with total income $200M. Do you think this regression is useful for planning you..
|
What is the amount of kristi realized gain
: What is the amount of Kristi's realized gain and recognized gain and the basis in her new property?
|
What is the wacc it should use for the project
: Lawler's is considering a new project. The company has a debt-equity ratio of 0.62. The company's cost of equity is 15.1 percent, and the aftertax cost of debt is 8.8 percent. The firm feels that the project is riskier than the company as a whole and..
|
Calculate the percentage error using the abc costs
: Using the costs assigned in Requirement 1, calculate the percentage error using the ABC costs as a benchmark. Comment on the value and advantages of this ABC simplification.
|
How many pounds of plastic does aja need to purchase in 2016
: The Aja Co. expects to produce 2,000 baskets in 2016. Each basket requires 2 pounds of plastic. Aja has 225 pounds of plastic on hand at the end of 2015, and it wants to have 190 pounds on hand at the end of 2016. How many pounds of plastic does Aja ..
|
Can terrence enforce the contract
: Terrence, an adult, enter into a contract with Bobby, a 16 year old. Before either party changes position, Bobbys parents find out and tell Terrence the deal is off. Can Terrence enforce the contract
|
Why capm equation might be more relevant than other
: Explain with a graph how SML is different from CML. Why CAPM equation might be more relevant than other equations when calculating required rate of return.
|
Assume spending will continue at the same rate
: Your project is progressing well in your estimation. Your team has collected the following data. From these data, calculate the project’s ETC. Activity A is 60% complete at a cost so far of $50,000. It was estimated to cost $200,000 when finished. It..
|