Calculate the net expected value for the project risks

Assignment Help Basic Computer Science
Reference no: EM13316248

Calculating risk . 

You are planning to make modifications to an existing application. You have identified: 

•30% probability of delay of receipt of resources - cost $50,000. 

•20% probability that the resources will be $10,000 cheaper than planned. 

•25% probability that there will be a problem integrating with existing software, cost to fix $3,500. 

•30% probability that the development may be simpler than expected, savings $2,500. 

•5% probability of a design defect causing $5,000 of rework. 

Calculate the net expected value for the project risks and opportunities cited above. How much should you plan for your contingency reserve budget based on the above? You must show and explain all of your calculations. How much would you allocate for the management reserve? What are your assumptions about these reserves? 

Include relevant information--facts and/or opinions--from “expert” sources to support selections. Citations and references must be written in Harvard style of citation. Your paper should be approximately 850-1000 words not counting title page and references. 

at least 3 reference books

Verified Expert

Reference no: EM13316248

Questions Cloud

What is the radius of each of the plates : You are required to build a 12 picofarad capacitor. If the plates can be only 2mm apart and circular, what is the radius of each of the plates
Derive the equation for centripetal acceleration : A particle is moving around in a circle and its position is given in polar coordinates as x = Rcos?, and y = Rsin?, derive the equation for centripetal acceleration
Identify the cause the risk and the effect : We might go significantly over budget because we have no formal change management system in place to track the costs of changes in the scope of work agreed upon between the customer and the supplier.
Calculate what interest rate must the investment earn : A mining firm makes annual deposits of $250,000 into a reclamation fund for 20 years. If the firm must have $10 million when the mine is closed; what interest rate must the investment earn
Calculate the net expected value for the project risks : Calculate the net expected value for the project risks and opportunities cited above. How much should you plan for your contingency reserve budget based on the above?
What is the weight of the heaviest bear : The density of ice is 917 kg/m3, and the density of sea water is 1025 kg/m3. What is the weight of the heaviest bear that the ice can support without sinking completely beneath the water
What is the velocity of the arrow immediately after release : An archer pulls back 0.75 m on a bow which has a stiffness of 200 N/m. The arrow weighs 50 g. What is the velocity of the arrow immediately after release
Determine length of roadway that is in full superelevation : Determine the length of roadway that is in full superelevation for a four-lane expressway with a 60 mph design speed. The BC of the curve is at station 15+00 and has a minimum allowable radius. The curve delta is 25 degrees and 30'.
Find the magnitude of the total momentum of two-cart system : a 4.0 kilogram cart moving to the right and a 6.0 kilogram cart moving to the left on a horizontal frictionless surface. find the magnitude of the total momentum of the two-cart system

Reviews

Write a Review

Basic Computer Science Questions & Answers

  Identifies the cost of computer

identifies the cost of computer components to configure a computer system (including all peripheral devices where needed) for use in one of the following four situations:

  Input devices

Compare how the gestures data is generated and represented for interpretation in each of the following input devices. In your comparison, consider the data formats (radio waves, electrical signal, sound, etc.), device drivers, operating systems suppo..

  Cores on computer systems

Assignment : Cores on Computer Systems:  Differentiate between multiprocessor systems and many-core systems in terms of power efficiency, cost benefit analysis, instructions processing efficiency, and packaging form factors.

  Prepare an annual budget in an excel spreadsheet

Prepare working solutions in Excel that will manage the annual budget

  Write a research paper in relation to a software design

Research paper in relation to a Software Design related topic

  Describe the forest, domain, ou, and trust configuration

Describe the forest, domain, OU, and trust configuration for Bluesky. Include a chart or diagram of the current configuration. Currently Bluesky has a single domain and default OU structure.

  Construct a truth table for the boolean expression

Construct a truth table for the Boolean expressions ABC + A'B'C' ABC + AB'C' + A'B'C' A(BC' + B'C)

  Evaluate the cost of materials

Evaluate the cost of materials

  The marie simulator

Depending on how comfortable you are with using the MARIE simulator after reading

  What is the main advantage of using master pages

What is the main advantage of using master pages. Explain the purpose and advantage of using styles.

  Describe the three fundamental models of distributed systems

Explain the two approaches to packet delivery by the network layer in Distributed Systems. Describe the three fundamental models of Distributed Systems

  Distinguish between caching and buffering

Distinguish between caching and buffering The failure model defines the ways in which failure may occur in order to provide an understanding of the effects of failure. Give one type of failure with a brief description of the failure

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd