Calculate the necessary angular velocity for the swings

Assignment Help Civil Engineering
Reference no: EM131037317

A "swing ride" is shown in the figure. Calculate the necessary angular velocity for the swings to assume an angle θ = 35° with the vertical. Neglect the mass of the cables and treat the chair and person as one particle.

831_ce0d82b0-6a2b-40ae-80c3-89bfb6bd9e67.png

Reference no: EM131037317

Questions Cloud

Determine the maximum speed for each car : determine the maximum speed for each car. The coefficient of static friction is πs =0.90 for both cars.
Complete the manufacturing budget : Complete the Manufacturing Budget on the Budgets tab below by using the information found in the budgeted balance sheet above. The manufacturing budget consists of three parts: the Raw Materials Budget, the Direct Labor Budget, and the Factory Ove..
History of business ethics and stakeholder theory in america : One thing nice about this course is that you will find your background reading page rather short... but there will still be a respectable amount of reading to do. The reason for this is because will be using a text book for your case assignments. ..
Repeat the design of the amplifier specified in problem : Repeat the design of the amplifier specified in Problem 9.108 utilizing a Widlar current source (Fig. 8.42) to supply the bias current. Assume that the largest resistance available is 2 kΩ.
Calculate the necessary angular velocity for the swings : Neglect the mass of the cables and treat the chair and person as one particle.
Prove that every integer is either even or odd : Let R1 and R2 be ordered fields that satisfy the Least Upper Bound Property. Then there is a function f: R1→ R2 that is bijective, and that satisfies the following properties. Let x, y ∈ R1
Retailer level of product availability : Explain how an efficient supply chain system can increase a retailer's level of product availability and decrease its inventory investment
Basic current mirror to implement the current source : Design the circuit of Fig. 9.36(a) using a basic current mirror to implement the current source I. It is required that the short-circuit transconductance be 5 mA/V. Use ± 5-V power supplies and BJTs that have β = 100 and VA =100 V. Give the comple..
Question regarding the master scheduling : As the textbook describes, a "master scheduling is the heart of production planning and control."  This planning in master scheduling drives every aspect of the company from material requirements, capacities, delivery, and commitments to customers..

Reviews

Write a Review

Civil Engineering Questions & Answers

  Find the rate of change in volume

A water tank has a height of 120m, and its area of cross-section is 2000m. Water is released from the tank and the water level drops by 1 meter every minute. Find the rate of change in volume.

  Water is observed to be seeped through this slope at a rate

The relative density of a sloped sand deposit is known to be 75%. Water is observed to be seeped through this slope at a rate such that the discharge velocity is 0.6 m/day.

  Hydrographic survey deals with the study of

Hydrographic survey deals with the study of An ideal vertical curve to join two gradients is called?

  Find the variance and standard deviation for random variable

Let X be a random variable defined by the density function f(x) = 3X^2 0

  What is the length of the line

A line  is measured with a 2-chain tape, and a suveyors arrows  are use to  mark the end of the tape lengths . the three tallies are recorde the rear tapeman has eight arrows

  Calculate the position of the loop as the end of the whip

Assuming the mass of the whip is uniformly distributed along its length, calculate the velocity of the end of the whip as a function of the position of the loop (x), and calculate the position of the loop as the end of the whip breaks the speed of so..

  Calculate the amount of water to be added per cubic meter

An undisturbed soil sample has a total unit weight of 19.4 kN/m3, a dry unit weight of 16.9 kN/m3, and a specific gravity of soil solids (Gs) of 2.69. If the sample could be saturated without changing its porosity, calculate the amount of water (i..

  Determine the change in kinetic energy and the power output

Steam flows steadily through an adiabatic turbine. Theinlet conditions are 10 MPa, 450 C and 80 m/s. and the exitconditions are 10 kPa, 92% quality at 50 m/s.

  Determine the radius of influence of the pumping

A well with a radius of 0.5 m pumps at a constant rate of 1240 m3/day. After the cone of depression has achieved equilibrium, the piezometric heads at two observation wells 40 and 95 m from the pumping well are measured as 78.9 and 83.4 above sea ..

  Determine what is the largest circle that can be inscribed

What is the largest circle that can be inscribed within a polygon with corner coordinates (600,800), (900, 300), (500, 100), and (100, 40) Find the radius of the largest circle and show how you found it from these coordinates.

  Determine the porosity and permeability of the block

In a second block, you drill a single larger-diameter hole, so that the porosity is the same as your first block. What is the diameter of the hole? What is the permeability of the second block?

  Determine the system behavior

For this problem, read and understand the specifications to determine the system behavior. The specifications are intentionally somewhat ambiguous. If you find some rules on system behavior unavailable, state your assumptions and proceed forth wit..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd