Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A polymer sample was characterized by membrane osmometry in acetonitrile at 300K. The osmotic data are reported below as a function of polymer concentration
(N.m-2 )
C (g.dm-3)
33.2
0.8
66.4
1.6
99.6
2.4
132.8
3.2
Demonstrate that acetonitrile is a -solvent for the polymer at 300K and calculate the molar mass.
Summary
This question belongs to polymer science and given osmotic data as a function of polymer concentration. You have to find polymer molar mass
consider the time it takes the faculty of pwsh to drive to school. the mean and the median times are calculated. of the
how long does it take to commute from home to work? it depends on several factors including route traffic and time of
Show that there is a point P with x-coordinate 3 at which the line tangent to the curve at P is horizontal. Find the y-coordinate of P.
A parabolic arch has a horizontal base 80 m long and the highest point is 64m above the base. Determine the height of the arch at a point 10m from either end of the base.
a baseball team has home games on thursday and sunday. the two games together earn 3725.50 for the team. thursdays
Suppose u(x, y) and v(x, y) are harmonic in a region under? Under what condition is the product u(x, y) . v(x, y) harmonic? In particular, when is (u^2)(x, y) harmonic?
Parametric equations for the line through {1,2,3} parallel to the vector {5,6,-4} are, A friend taking the old-fashioned course tells you that the xyz-equations for this line are
Assume that the number of highway miles that can be graded , is a function of both the hours of labor and of the number of machines. Find the minimum cost of grading 20 miles given that the hourly rates for labor and machines are $ and $.
The RideEm Bicycles factory can produce 110 bicycles in a day at a total cost of $10,600 and it can produce 130 bicycles in a day at a total cost of $11,200. What are the company's daily fixed costs.
Suppose X, Y and Z are random variables with joint density funciton f (x, y, z) = Ce^-(0.5x+0.2y+0.1z) if x>0, y>0, z>0 and f(x, y, z) = 0 otherwise.
find the distance from the point y=(9,9,0,0) to the subspace V
Are there any absorbing states? I know that I have to set up a transition matrix, but I am having trouble after that. Can you help me?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd