Calculate the minimum required cross-sectional area

Assignment Help Civil Engineering
Reference no: EM13535621

A short reinforced concrete column is subjected to a 1000kn axial compressive load.

The moduli of elasticity of plain concrete and steal are 25 GPa and 207GPa respectively, and the corss-sectionial area of steel is 2% of that of the reinforced concrete.

Considering the column as a structural member made of a composite material and subjected to load parallel to the steel rebars, calculate the following:

c. the minimum required cross-sectional area of the column given that the allowable comopressive stress of the plain concrete is 20MPa and that the allowable compressive stress of the plain concrete will be reached before that of the steel.

Reference no: EM13535621

Questions Cloud

A water pump can generate a pressure diference : A water pump can generate a pressure diference ΔP (psi) given by ΔP=145-0.1Q2, Q is the flow rate in ft3/s. It suplies a pipe of diameter 20", roughness of .5 inches and length of 2500 ft.
Determine the net power delivered and the cycle efficiency : Determine the net power delivered and the cycle efficiency. What is the percent increase in the efficiency compared to an otherwise identical system with no regeneration. Assume “cold air-standard cycle” for both systems above.
What are the heat addition rate in the combuster and the : A “Cold Air-Standard Brayton cycle” gas-turbine power plant delivers a net power output of 60 MW to an electric generator. The compressor intake temperature is 300 K and the maximum temperature in the cycle is 1200 K.
What is the diameter of the bubble before it reaches : Listed on cramster as ask. There is a car driving through water. Velocity is 12mph. Find h (max water depth) that will alow car to pass. List all assumption and calculations is the problem statement.
Calculate the minimum required cross-sectional area : The moduli of elasticity of plain concrete and steal are 25 GPa and 207GPa respectively, and the corss-sectionial area of steel is 2% of that of the reinforced concrete.
Calculate the detention time in hours horizontal velocity : Two rectangular clarifiers(sedimentation basins), each 30 ft long, 15 ft wide, and 10ft deep, settle a combinedtotal of 0.40 mgd following alum coagulation. The effluent channelshave a total weir length of 60ft in each basin
The angle theta which the 6-lb. uniform rod makes with the v : A 5-lb force is applied to the center of the roller at A, causing the assembly to roll. If the roller has negligible mass, determine (a) the angle theta which the 6-lb. uniform rod makes with the vertical during the roll, and
Select the beam dimensions and reinforcement for a balanced : A rectangular concrete beam has f'c=3000 psi and steel with fy=40ksi. Select the beam dimensions and reinforcement for a balanced section if the beam sustains a moment as a result of dead load of 60 kip-ft and a moment as a result of live load of 90 ..
Estimate the discharge rate of the pipeline : Reservoir A (water surface elevation = 1300 ft) is connected to reservoir B (water surface elevation=250 ft) by 6,000 ft of 14 inch diameter cast iron pipe (e = 0.005 ft. Neglecting all minor losses

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine largest angle through which end a can be rotated

Knowing that the modulus of rigidity is 77 GPa for the steel and 27 GPa for the aluminum, determine the largest angle through which end A can be rotated if the following allowable stresses are not be exceeded

  Calculate the axial stress in the copper and the steel

A steel flat bar of dimensions 4x1x12 inches is PINNED between two copper bars of dimensions 4x2x12 inches at room temp. The PINNED assembly is then cooled by 200 degrees fahrenheit.

  What is the boiling point of water at an elevation of 2000m

the boiling point of water decreases wiht elevation because of the pressure change. what is the boiling point of water at an elevation of 2000m and at an elevation 4000 m for standard atmospheric conditions

  What is the probability you will brake to stop within feet

For a car traveling 35 mph the distance required to brake for a stop is normally distributed with mean of 55 feet and standar deviation of 8 feet. You are traveling 35 mph in a residential area and a car moves abrupt into your path at a distance o..

  Explain the necessity of super elevation in the design

explain the necessity of super elevation in the design of horizontal curve also prove that rv=v2/{g(fs+e)}

  Find the difference in depth of the liquid from the inside

Liquid flows with a free surface around a bend. The liquid is inviscid and incompressible, and the flow is steady and irrotational. The velocity varied with the radius across the flow as V = 1/r m/s where r is in meters.

  Determine the base of the following arithmetic operation

A distance of 72.55ft. is recorded. A steel tape is supported atthe ends with a tension of 15 lb. and weighting 0.016lb/ft2 . Find the distance corrected for sag.

  Determine the specifc energy of water in the channel

A rectangular channel is 25ft wide and has a flow of 500 cfs at a velocity of 5ft/s. (a) Determine the specifc energy of water in the channel. (b) What is the criticl depth of water in the channel (c) What is the critical velocity

  Determine what is the discharge in cubic feet per second

A 2 foot tall multi-stage weir placed in a channel to cause the water to flow over the contracted weir at a height of 0.75 feet. There are 2 contractions and the original length is 6 feet. What is the discharge, in cubic feet per second

  How the design engineer has decided to support on a system

According to a settlement analysis, the weight of this fill will cause 600 mm of the total settlement over a period of 30 years. The differential settlement will probably be about 100mm. Although the building could be supported on spread footing f..

  What are the key aspects of the drawing to check

As a design engineer you are responsible for all the drawing documentation from your organisation. What are the key aspects of the drawing you need to check before sending it to the construction division

  Determine the distance between the stations brought to rest

A train starts from rest at station A and accelerates at 0.5m/s^2 for 60s. Afterwards it travels with a constant velocity for 25min. It then decelerates at 1 m/s^2 until it is brought to rest at station B.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd