During construction of the surface layer of asphalt pavement, two samples where taken everyday to measure the asphalt content in the mix to ensure that it is within the specification limits.the target value was set at 5.5 percent with a tolerance of -+ 0.4 percent. the following asphalt content data were collected:
a) Calculate the mean, standard deviation, and the coefficient of the variation of the data.
b)Using a spreadsheet program, create a control chart for these data showing the target value and the upper and lower specification limits. comment on any trend and possible reasons.
A roadway is to be designed on a level terrain. The roadway is 500 ft. Six Cross Sections have been selected at 0 ft, 100 ft, 200 ft, 300 ft, 400 ft, and 500 ft. . The cross sections have areas of 130 ft2, 140 ft2, 70 ft2, 110 ft2, 80 ft2, and 25 ..
A municipal water supply became contaminated with benzene (Cw=50g/L). It was decided that until the contaminant source could be identified and remediated, all household faucets would be fitted with a granular activated carbon(GAC) filter bed to ad..
the front of our library has six double doors and the doors rotate open in the middle making less clerance room how can i get started
The suspended load exerts a force F = 600 lb at A and bar OA weighs 200 lb. Assume that the bar’s weight acts at its midpoint. Determine the tensions in the cables and the reactions at the ball and socket support O. Draw complete FBD(s) for full cred..
Two reservoirs are connected with a 30" diameter pipe with a length of 19,680 ft. The water surface elevation in the upper reservoir of the upper reservoir is 984 ft, lower reservoir 886 ft and the elevation at the midpoint is 918 ft.
The flow of water over a weir, can be computed by Q=5.35LH^(3/2), where Q is the volume low rate of water in cubic feet per second, L is the length of weir in feet, and H is the height of water over the weir in feet.
At the morning break, an industrial engineer quickly measures the worker's heart rate and finds a peak value of 110 beats/min one minute after stopping work and a value of 95 beats/min three minutes after stopping work.
a rectangular prism box which is floating on water has a length L =1200mm, breadth = 800mm, height = 500mm and mass of 52kg. when the box is loaded with the suspended hexagonal mass, its immersion is 300mm, and when it the mass is placed inside th..
Torque is transferred through two shafts by means of gears. If the diameters of gears B and C are in the ratio 1:2, what should the ratio of shaft diameters be so that both shafts have the same shear stress
Water from a lower reservoir (water surface elevation) 500 m is pumping to the upper reservoir (water surface elevation 600 m) through a 5000 m long straight pipe with 0.5 m diameter
Water flows through a horizotal 45 deg reducing bend with a 36 inch. diameter upstream and a 24 inch diameter downstream, at the rate of 20 cfs under a pressure of 15 psi at the upstream end of the bend. Neglecting head loss in the bend, calculate..
A torque of T = 3.00 kN-m will be applied to the hollow thin-walled aluminum alloy section. If the section has a uniform thickness of 4 mm, determine the magnitude of the maximum shear stress developed in the section.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!