Calculate the mean and standard deviation for your month

Assignment Help Engineering Mathematics
Reference no: EM131291187

1. If six 6-sided dice are rolled,

a) What are the minimum, maximum and expected values for the total?

b) Find the probabilities that the total will equal the following values:

(i) 6 + b
(ii) 12 + c
(iii) 18 + d
(iv) 24 + e

c) What is the probability of matching or exceeding the values in (i), (ii) and (iii) if only five dice are used?

d) In terms of minimum, maximum, expected and probabilities of the total, what are differences in rolling four 8-sided dice compared with eight 4-sided dice?

2. Use your f value to choose a month according to the table below:

f

Month

0

January

1

February

2

March

3

April

4

May

5

June

6

July

7

August

8

September

9

October

a) Use the data for hours of sunshine per month for your particular month, to draw a graph with the years plotted on the horizontal axis, and the hours of sunlight on the vertical axis.

b) Calculate the mean and standard deviation for your month

c) Draw a second graph showing both your month and the following month.

d) Replot the graph from c) using a seven year moving average on both sets of data.

e) In no more than 100 words, compare the graphs in c) and d).

3. Using your f value, select 20 years of sunshine data from July and August, with the first year being 198f (i.e. 1980+f)

a) Use the Mann-Whitney test to investigate whether there is a difference between the medians of the hours of sunshine.

b) Use an appropriate statistical test to investigate whether there is a significant difference between the means of the hours of sunshine.

c) Investigate how your results for a) and b) change by artificially introducing errors to your data.

4. The table below shows minimum and maximum daily river levels in metres on the Mersey published by www.riverlevels.uk. Change these values using your ID number as indicated before proceeding.

Date

Minimum

Maximum

01/06/2016

2.05

8.32

02/06/2016

1.52

3.66

03/06/2016

1.88-0.1*a

2

04/06/2016

1.25

2.71

05/06/2016

1.5

3.83

06/06/2016

2.32

5.18+0.1*b

07/06/2016

3.42

6.6

08/06/2016

4.66

7.8

09/06/2016

5.89-0.1*c

8.49

10/06/2016

7.08

8.52

11/06/2016

7.89

7.91

12/06/2016

6.99

8.18+0.1*d

13/06/2016

5.62

7.78

14/06/2016

4.18

6.95

15/06/2016

3.28-0.1*e

5.81

16/06/2016

2.71

4.55

17/06/2016

2.59

3.3

18/06/2016

2.51

2.85+0.1*f

19/06/2016

2.15

3.39

20/06/2016

2.48

4.15

Draw a correctly labelled scatter diagram with the minimum depth on the horizontal axis, and the maximum depth on the vertical axis, find the correlation coefficient, and calculate the equation of the line of best fit.

Double your maximum depth values and then recalculate the correlation coefficient and the equation of the line of best fit. Discuss these results.

5. A survey has been carried out to investigate preferences on the following alternative uses of farmland.

• Biofuels for transport
• Photovoltaic arrays
• Wind turbines

Each respondent has been asked to pick which option they would prefer. The numbers for each option have been split into age ranges, as shown in the table.

Age range (years)

Biofuels for transport

Photovoltaic arrays

Wind turbines

< 40

22 + a

64

83

40 - 60

52

78 - b

46+c

> 60

31 + e

56 - f

19

You are to use the chi squared test to assess whether different age ranges responded differently to the questions.

Reference no: EM131291187

Questions Cloud

Compare and contrast this economy with the u.s. economy : Compare and contrast this economy with the U.S. economy, emphasizing the differences due to the presence of derivative markets in the latter.
Provide a brief description of three cikr that exist : Provide a brief description of 3 CIKR that exist within your community. Select one CIKR and identify the private and public partnership structure. What Sector-Specific Agency would be responsible for providing protection of this CIKR?
Question regarding the electronic health records : Pick any video of your preference. Post under the Discussion Board a 250 words summary report following APA format describing the "Training Video" you have selected and describe the benefit of this specific video you selected from the Electronic H..
Define what quality healthcare means : Define what quality healthcare means from the perspective of one or more of these groups:
Calculate the mean and standard deviation for your month : What are the minimum, maximum and expected values for the total - Calculate the mean and standard deviation for your month and Draw a second graph showing both your month and the following month.
Emphasizing the connections between business : Watch the video case study (link below) and discuss the case emphasizing the connections between business, law, politics, and ethics.
Distinguish between coercive and reward power : 1. Distinguish between coercive and reward power. 2. Which tactics seem to be the most effective? Explain your answer.
What are its essential features : Project finance is difficult to define. What are its essential features? When deciding whether or not to back a project finance proposition, what essential features do potential lenders home in on?
Explain the measures of occurrence and association : Explain the Measures of Occurrence and Association- Issues relating to the measurement of both the exposure and the outcome. Possible confounding factors and effect modifiers and how to overcome their effect.

Reviews

len1291187

11/26/2016 2:31:57 AM

All answers need to be solved with detailed explanations. . The number to be used for the problems is written in red within the uploaded document. For further details, please see the uploaded document.

len1291187

11/26/2016 2:31:37 AM

Your task is to write a report on a series of statistical tests, as described below. This assignment should be treated as if it were a report for your employer. It should include the data, sample calculations and conclusions based on the data and the statistical results. It should not contain descriptions or definitions of the statistical processes themselves.General Notes:- The hours of sunlight data is from www.metoffice.gov.uk You should ensure that you state suitable hypotheses within your report whenever this is appropriate. You must include sufficient information within your report to demonstrate that you have done your calculations correctly All graphs must have sensible titles, and clearly (and correctly) labelled axes. Your report is to be submitted as ONE document through Blackboard. This document must be in either WORD or PDF. You can copy and paste from Excel into Word easily. Note that any assignment which is submitted differently will not be marked. Also note that you must word-process your document. Handwritten scanned pages are not acceptable.

Write a Review

Engineering Mathematics Questions & Answers

  Prime number theorem

Dirichlet series

  Proof of bolzano-weierstrass to prove the intermediate value

Every convergent sequence contains either an increasing, or a decreasing subsequence.

  Antisymmetric relations

How many relations on A are both symmetric and antisymmetric?

  Distributed random variables

Daily Airlines fies from Amsterdam to London every day. The price of a ticket for this extremely popular flight route is $75. The aircraft has a passenger capacity of 150.

  Prepare a system of equations

How much money will Dave and Jane raise for charity

  Managing ashland multicomm services

This question is asking you to compare the likelihood of your getting 4 or more subscribers in a sample of 50 when the probability of a subscription has risen from 0.02 to 0.06.]  Talk about the comparison of probabilities in your explanation.

  Skew-symmetric matrices

Skew-symmetric matrices

  Type of taxes and rates in spokane wa

Describe the different type of taxes and their rates in Spokane WA.

  Stratified random sample

Suppose that in the four player game, the person who rolls the smallest number pays $5.00 to the person who rolls the largest number. Calculate each player's expected gain after one round.

  Find the probability density function

Find the probability density function.

  Develop a new linear programming for an aggregate production

Linear programming applied to Aggregate Production Planning of Flat Screen Monitor

  Discrete-time model for an economy

Discrete-time model for an economy

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd