Reference no: EM131256155
Chapter 23 End-of-Chapter (EOC) Project
Complete this project as a separate word or pdf file
Submit as a Canvas Assignment at the course website
Clearly Print Your Name and Assignment Name at the top of each page
Cave Creek Industrial Works has the following standards for one of its products.
Direct Material (3ft @ $4) $12.00
Direct Labor (.4hr @ $12) $ 4.80
During the most recent year, the following actual results were recorded.
Production 6,000 Units
Direct Material (11,750ft @ $5.20) $61,100
Direct Labor (2,900Hr @ $10.20) $29,580
1. Calculate the Materials Price Variance
2. Calculate the Materials Usage Variance
3. Calculate the Labor Rate Variance
4. Calculate the Labor Efficiency Variance
Effectiveness with respect to certain areas
: 1. Describe specific qualitative methods and tools that could be used within your discipline to gather data. Include your rationale. 2. Evaluate their effectiveness with respect to certain areas within your discipline. 3. Include company or organiz..
|
What elevation should the engineer have quoted
: A group of explorers desired their elevation. An engineer boiled water and measured the temperature to be 82°C. They found a fluid mechanics book in a backpack and the engineer told the group their elevation! What elevation should the engineer hav..
|
What were the leading causes of hyperination
: Trace out the events leading to hyperinations in either Germany from 1922-1923, Hungary from 1945-1946, or Zimbabwe from 2007-2008. What were the leading causes of hyperination? How was this hyperination eventually dealt with?
|
Proposal for a new product or reflecting a certain problem
: Using your knowledge and guidelines, you are requested to write a report to your manager either showing him a certain proposal for a new product or reflecting a certain problem/crisis/issue in your department. The report could be either informatio..
|
Calculate the materials price variance
: Calculate the Materials Price Variance. Calculate the Materials Usage Variance. Calculate the Labor Rate Variance. Calculate the Labor Efficiency Variance.
|
Find the temperature of the water
: Water is forced through a contraction causing low pressure. The water is observed to "boil" at a pressure of -11.5 psi. If atmospheric pressure is 14.5 psi, what is the temperature of the water?
|
Web research assignment visit the following websites
: Choose the one that you think is the best, based on information included and clarity of ideas. Write a paragraph describing it (this is called an annotation). Cite the reasons that the site seems credible (is the information accurate, has it been ..
|
What is the maximum possible spacing of the pumps
: Oil is transported through a pipeline by a series of pumps that can produce a pressure of 10 MPa in the oil leaving each pump. The losses in the pipeline cause a pressure drop of 600 kPa each kilometer. What is the maximum possible spacing of the ..
|
Draw a graph illustrating the crossover point
: Draw a graph illustrating the crossover (or indifference) point. - Determine the number of units where either choice has the same cost.
|