Problem - The Standard specifications for an electric motor manufactured by AAA Electric Co. follow:
Standard Cost per Unit:
Materials (2lb x $5 per lb) $10.00
Labor ($4 hr x $12 per hr) $48.00
Factory Overhead (4hr x $3.38* per hr) $13.52
Total Standard Cost $71.52
*1.00 variable + 2.38 fixed = 3.38
Factory overhead rates are based on a normal 70% capacity and use the following flexible budget:
Normal
70% 80% 100%
Motors to be produced 2100 2550 3000
Variable Overhead $8400 $10200 $12000
Fixed Overhead $20000 20000 20000
The actual production was 2500 motors and factory overhead costs totaled $29750.
Calculate the factory overhead variances using the two-variance method.
Write a prolog predicate to check if one can reach exit
: A special point, called exit, represents the exit from the map. Write a PROLOG program to check if, given a starting point, one can reach exit.
|
Write a prolog program which defines the predicate fib
: Write a PROLOG program which defines the predicate fib (I, X), where I is a positive integer and X is the I- Fibonacci number.
|
How does a project manager decide that one estimate good
: How many different estimating techniques were discussed in the case? 3. If you were the project manager, which estimate would you use?
|
What is the responsibility accounting system
: Consider the manager of the home appliance department at a Home Depot store. For this manager, list two (2) costs that are controllable.
|
Calculate the factory overhead variances
: The actual production was 2500 motors and factory overhead costs totaled $29750. Calculate the factory overhead variances using the two-variance method
|
What is the intended meaning of the given queries
: Write a PROLOG program which checks if a list contains another as a sublist. What is the intended meaning of the given queries?
|
Determine the accounts receivable turnover
: Company reports the following: Net sales $1,368,750 Average accounts receivable (net) $109,500 Round your answers to one decimal place.
|
Calculate the amount of materials price variance
: Calculate the Amount of materials price variance to be prorated to finished goods inventory at Dec. 31 and Total amount of direct materials cost
|
Analyze the temporary differences
: Prepare a schedule to arrive at adjusted pretax financial reporting income (reflecting all permanent difference). Analyze the temporary differences.
|