#2 Consider a project having the following ten activities: 

Activity

Immediate Predecessors

Normal Time (weeks)

Normal Cost

($)

Crash Duration

(weeks)

Crash Cost

($)

Max. Weeks Reduced

A

none

7

3,000

6

6,000

1

B

A

8

5,000

6

9,000

2

C

A

2

2,000

1

3,000

1

D

A

4

3,000

4

3,000

0

E

B, C

9

4,000

7

6,000

2

F

C, D

6

4,000

4

9,000

2

G

E

2

3,000

2

3,000

0

H

E, F

9

4,000

7

7,000

2

I

G

1

4,000

1

4,000

0

J

H, I

8

2,000

6

7,000

2

(a) Draw a network diagram. What is the expected project completion time?

(b) What is the critical path?

(c) What is the most economical way and how much will it cost to reduce the completion time of the project by three weeks? By five weeks?

Please be very clear and neat when writing the answer i would greatly appreciate it and show all work . Thank you and you will be rewarded highest amount of points

 

 

Reference no: EM13103766

Questions Cloud

Actual weights of chocolate bars : Chocolate bars produced by a certain machine are labeled with 16.0 oz. The distribution of the actual weights of these chocolate bars is Normal with a mean of 16.1 oz and a standard deviation of 0.1 oz. A chocolate bar is considered underweight if..
Compute the expected duration and variance : A network consists of the following list. Times are given in weeks. Calculate the expected duration and variance of each activity.
Find the distance the plane moves : A steam catapult launches a jet aircraft from the aircraft carrier John C. Stennis, giving it a speed of 210 mi/h in 3.00 s. (a) Find the average acceleration of the plane. m/s2 (b) Assuming the acceleration is constant, find the distance the plan..
Explain binomial probabilities : Based on p=.60, probability that a randomly selected homeowners will say no to newspaper subscription.
Calculate the expected project completion time : Consider a project having the following ten activities. Draw a network diagram. What is the expected project completion time?
Topic on probability : The condition for the question is that the deck of cards has 52 cards and among them are 12 face cards. What is the probability of choosing 6 face cards out of 8 chosen. Thru Binomial distribution holds( meaning with replacement)
Determine the ucl and lcl of the p chart : In an organization, 10 samples of 50 items each were collected to check for defect. The result is provided in the table.
Population mean concentration of uric acid : Find a 95% confidence interval for the population mean concentration of uric acid in this patient's blood. (Round your answer to two decimal places.)
Academic approach-statistics-probability : A City Survey states that 70 percent of all business owners favor increasing the parking fees. The city has commissioned a random sample of n = 100 business owners.

Reviews

Write a Review

Operation Management Questions & Answers

  Graphically decide a daily production plan that minimizes

Graphically decide a daily production plan that minimizes the cost of meeting Leary Chemical's daily demands.

  Illustrate what are your candidates for bad design

Make a list of the factors which make a design unworkable. Which one of the designs on the website is your favourite. Illustrate what are your candidates for bad design.

  Calculate total share of the viewing audience

Nielsen ratings are very important to both advertisers and television programmers because the cost of television advertising time is based on this rating.

  Conclude explain how you would use these figures to monitor

Describe illustrate what project management application you might use to measure also improve the performance. Conclude explain how you would use these figures to monitor productivity over time.

  Aware of when using equity financing

If you decide to use equity financing, where would you find equity financing? What should you be aware of when using equity financing?

  Compute the upper also lower standard control limits

the Chair sampled 500 final grades from last yr for each instructor also computed the number of failures per instructor as 13, 11, and 0 also 16 respectively. Compute the upper also lower standard control limits for this chart.

  Explain how do they assess the companies they rate

Conduct research on organizations that rate companies on a specific facet of social responsibility. Explain how do they assess the companies they rate.

  Identify at least one potential disadvantage to initiating

Identify at least one potential disadvantage to initiating, continuing, and/or expanding international operations

  Question on research design

What factors are most significant to you in determining the research design? Why do some researchers change their hypotheses after selecting the theoretical framework?

  Is it true application of other theory produce better result

Organisations based on the principles of scientific management will always perform well. Is this true, or might the application of other theories produce better results.

  Foreign exchange traders

X and Y are foreign exchange traders in Germany. X agrees to sell 100 million Mexican pesos to Y for delivery within 1 week at an agreed price in German marks.

  Recognize generic similarities among nasa and union carbine

Do you recognize generic similarities or differences between the NASA and Union Carbine incidents and the organization culture where you currently work or an organization which you were associated with in the past?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd