Calculate the decay rate of radon in units of hr-1

Assignment Help Civil Engineering
Reference no: EM13310487

Indoor Air quality is greatly affected by Radon, which can cause lung cancer. When we moved to Colorado, we tested the house for Radon and installed a radon mitigation system.

Consider the diagram below as a model for radioactive indoor air pollution.

Assume the soil under my single story house emits 1.5pCi/m2 of Radon. To be conservative, assume that all this Radon seeps through the floor and into the house. The floor space is 250 m2 and the ceiling height is 3m. The air exchange in the house is 0.9 air changes per hour.

Answer the following questions

a) Calculate the decay rate of radon in units of hr-1.

b) Develop a mass balance equation for the concentration of radon in the house using the diagram above.

c) Assuming steady state, what is the concentration of radon in the house in pCi/m3. Let the ambient outdoor concentration be negligible.

Reference no: EM13310487

Questions Cloud

Use a single blank line to separate code blocks : Do not identify yourself in your source code file. The system will maintain your identity and keep the process of reviewing anonymous. Upload the this file using the Submission Facility below, then proceed to completing reviews.
Demonstrate six sigma proficiency : Demonstrate Six Sigma proficiency
Determine amount of coal used per day if heat of combustion : A coal fired power plant can be modeled as a heat engine. If the power output of the plant is 200 MW and the thermal efficiency is 42%, determine the amount of coal used per day if the heat of combustion from the coal is 24,000 kJ/kg.
How to calculate the work done by the gas : Calculate the work done by the gas if it expands against a constant pressure of 5 atm. -Answer is -1.14x10^4 J but just need to know how to get there.
Calculate the decay rate of radon in units of hr-1 : Indoor Air quality is greatly affected by Radon, which can cause lung cancer. When we moved to Colorado, we tested the house for Radon and installed a radon mitigation system.
Explain what is the final concentration of cl2 in the flask : We place 1.32 mol PCl5 in a 1.0 L flask and allow it to reach equilibrium at a given temperature. What is the final concentration of Cl2 in the flask
Design a wireless network for your home network : Define the termcomputer-based information systems. In your definition, discuss three types of information systems, the audience or level of management served by each, and how the systems benefit the organization.
Determine what fraction of the cyanide is in the cn- form : Cyanide solutions used for heap leaching are made up of sodium cyanide (NaCN). The sodium cyanide solution ([NaCN]-total = 0.01 M) is kept at pH 10.4. The pH is kept high to keep the cyanide in the CN- form.
Compute the final molarity of acetate anion : Calculate the final molarity of acetate anion in the solution. You can assume the volume of the solution doesn't change when the ammonium acetate is dissolved in it.

Reviews

Write a Review

Civil Engineering Questions & Answers

  How many moles of water condense per cubic meter of feed gas

Suppose a sample of the 90 °C air is put in a closed variable-volume chamber containing a mirror, and the pressure is raised at constant temperature until a mist forms on the mirror. At what pressure would the mist form

  Determine what angle of twist

a beryllium copper wire having diameter of 1-50 mm and length of 40mm is used as a small torsion bar in an instrument. determine what angle of twist would result in the wire when it is stressed to 250 mpa.

  Compute force fa on roller and x- and y-components at o

The uniform 30 kg bar OB is secured to the accelerating frame in the 30 degree position from the horizontal by the hinge at O and roller at A. if the horizontal acceleration of the frame is a equals 20 m/s^2

  Determine the required mass of c and the length of the cable

if D has a mass of 600 kg, determine the required mass of C, the maximum sag h of the cable, and the length of the cable between the pulleys A and B. The Beam has a mass per unit length of 50 kg/m.

  Prove that the fluid in the pipe will flow from a location

Assume that you have a constant diameter pipe that has no pumps or turbines connected to it.Prove that the fluid in the pipe will flow from a location with high piezometric pressure to one with low piezometric pressure.

  Find the rate of change of temperature measured by the probe

a temperature probe moves with the velocity 2i+2j-3k through air. the temperature of air changes as T(x,y,z,t)=(2x^2-3y+z^3)cos(at). Find the rate of change of temperature measured by the probe.

  Find average rate of co emissions during two hour period

above a peninsula of land. the length of the box is 25 km, its width is 80 km, and a radiation inversion restricts mixing to 25 m. Wind is blowing clean air into the long dimention of the box at 0.8 m/s.

  What should the removal efficiency of a process designed

Wastewater flow of 2000 m3/day containing 120g/L of salt. Discharge into a river with a flow of 34,000 m3/day and a salt concentration of 50 mg/l. The agency wants to maintain the salt level to no greater than 250 mg/L downstream of the discharge.

  Estimate particle size will be collected with efficiency

A cyclone is designed with an inlet width (W) of 12.0 cm and has four effective turns. The inlet gas velocity is 15.0 m/s and the particle density is 1.70 g/cm3. (a) Estimate the particle size that will be collected with 50 % efficiency.

  How will alum floc described in part d need to enter basin

A water treatment plant with a maximum daily flow of 4.4 m3/s is treating surface water with a minimum ambient temperature of -1°C (30°F). The water is coagulated with alum and the alum floc was measured to have a settling velocity of 1.6 m/h at 1..

  Determine the speed of the stone

A 0.20 kg stone attached to a 0.8 m long string is rotated in a horizontal plane. The string makes an angle of 25° with the horizontal. Determine the speed of the stone.

  What is the original estimated duration of the project

The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd