Reference no: EM132388347 , Length: word count:1000
Process Improvement Techniques (Engineering)
Background
The company manufactures a range of specialist radiator and heat exchangers. A key component of all products is the metallic core tubing. Every product range contains these items. The company produces these tubes on a single machine. Due to the criticality of this equipment it is important to increase its effectiveness.
The process itself entails two raw material types, depending on product (brass or tin). Reels of raw material are loaded to the rear, and fed through the machine. The raw material is then folded, welded and cut to the required length, so producing the finished component.
Current situation
The company has designed a data collection chart and instructed operators to collect data. Currently there is one week's worth of data collected. No corrective action has been taken.
All breaks are covered (the machine is planned to run continuously) The shift starts at 8am and finishes at 4pm
A set-up is defined as a change of material or cutters (or both) Speed is recorded digitally and reported as an average over the shift.
The tasks
1. Calculate the daily availability, performance, quality and OEE figures (state any assumptions made).
2. Pareto analyse the losses and make brief recommendations for improvements.
Attachment:- tube machine.rar
How many standard deviations above the mean
: Assuming a normal distribution, how many standard deviations above the mean does a student have to score to be publicy recognized?
|
How information technology promotes
: How Information Technology (IT) promotes getting people who are affected by policies involved in the policy-making process. Cite specific examples.
|
National financial capability challenge exam
: High school students across the nation compete in a financial capabiltiy challenge each year by taking a national financial capability challenge exam
|
Managing Business Strategy Assignment Problem
: LEB-PGDBA (TopUp) - Managing Business Strategy Assignment Help and Solution, analysis of the strategic direction of organisation
|
Calculate the daily availability - performance and quality
: Calculate the daily availability, performance, quality and OEE figures (state any assumptions made) and Pareto analyse the losses and make brief recommendations
|
Calculate the value of the test statistic and the p-value
: Calculate the value of the test statistic and the p-value. At the 1% significance level, do the sample data support the health practitioner's belief?
|
What is the standard deviation
: If 4 stations are in use, what is the standard deviation? Round your answer to nearest hundredth.
|
Describing your information security and dr approach
: Describing your Information Security and DR approach. This will include your assessment of the value of your data and analytics,
|
Identify the level of measurement
: Identify the level of measurement (nominal, ordinal, or continuous [i.e., interval or ratio]) of the underlined concept as operationalized in each statement
|