Calculate the cycle time efficiency of the as is process

Assignment Help Business Management
Reference no: EM132968902

Case Study:

BUILTIT Construction Company. BUILTIT is a construction company specialized in public works (roads, bridges, pipelines, tunnels, railroads, etc.). Within BUILTIT, it often occurs that engineers working at a construction site (called "site engineers") need a particular type of equipment, such as a truck, an excavator, a bulldozer, a water pump, etc. BUILTIT has some heavy equipment available in its depot, but very often, it hires equipment when needed from specialized heavy equipment suppliers.

A piece of heavy equipment is called a "plant" in the construction jargon. When a site engineer needs to hire a plant, he/she sends a Plant Hire Request to one of the clerks at the depot. This request takes the form of a PDF document that the site engineer has to fill in. It takes on average 15 minutes for the site engineer to fill in and send the PDF file. Incoming plant hire requests usually stay about 15 minutes in the clerk's mailbox before being processed.

The clerk at the depot first checks if an appropriate plant (owned by BUILTIT) is available at the depot for the required period of time. If it is, the request is filed within one hour and the plant is delivered to the construction site usually in 4 hours. This happens in 10% of the cases. Otherwise, the clerk checks an information system that lists all equipment offered by the suppliers and selects the most cost-effective plant that complies with the request. She then checks the availability of the selected plant with the plant's supplier via phone or e-mail. This availability enquiry takes on average one hour. Sometimes (about 20% of the times), the selected plant is not available and the clerk has to select another plant and check its availability with its supplier, and so on.

Once the clerk has found a suitable plant available for hire, she recommends that it be engaged (to "engage a plant" is the term used to say that the plant will be hired). The engagement of every plant has to be approved by a "works engineer" who also works at the depot. The works engineer usually approves plant engagement requests twice per day. Because of that, a plant engagement approval takes on average 3 hours. In 10% of the cases, the works engineer rejects the plant engagement request. Half of the rejections lead to the cancellation of the Plant Hire Request (no plant is hired at all). The other 50% of rejections are resolved by replacing the selected plant with another plant (a cheaper plant or a more appropriate for the job). In this latter case, the clerk needs to perform another availability enquiry (or several enquiries). Once the works engineer has approved the engagement, the clerk sends a confirmation to the supplier (including a Purchase Order for hiring the plant) and she records the engagement in an Excel spreadsheet that she maintains in order to keep track of all the approved plant engagements. The clerk generates the Purchase Order using the company's financial information system (the "Finance Module" of an ERP system). It takes about 1 hour for the clerk to prepare and send the confirmation and purchase order. Most of this one hour is "waiting time".

During the process, it may happen (about 10% of the times) that the site engineer decides that the plant is no longer needed. In this case, he/she asks the clerk to cancel the request for hiring the plant.

When the plant is hired, the supplier delivers it to the construction site at the required date (or in about 6 working hours if the request is urgent). The site engineer inspects the plant and if everything is in order, he/she accepts the engagement and the plant is put into use. In 10% of the cases, the plant is sent back because the plant does not comply with the original specifications of the site engineer. In this case, the site engineer has to start the process all over again.

When the period of engagement is concluded, the supplier comes to pick up the plant. Sometimes (20% of the cases), the site engineer asks that the period of engagement to be extended. In this case, the site engineer requests an extension directly to the plant's supplier by e-mail or phone. On average, a plant is hired for a total period of 8 days (including extensions). Each plant hiring costs on average RM 200 per day, but there is a lot of variation: some types of plant (e.g. submersible water pump) costs RM 60 per day, while others (e.g. a large excavator) can cost up to RM 400 per day.

Five working days after the plant is picked up, the plant's supplier sends an invoice to the clerk by e-mail. After checking that the engagement corresponding to the invoice was fulfilled (by contacting the site engineer), the clerk forwards it to the financial department. It takes on average 10 days for an approved invoice to be paid. The approval of the invoice takes on average 5 days, oftentimes because site engineers are very busy and do not take the time to do their part of the approval. In about 10% of cases, the invoice is not approved, either because the site engineer states that the plant was not used to the stated period, or because the amounts in the invoice do not match the prices initially quoted, or because the invoice includes amounts for damages to the plant and the site engineer does not agree that those damages took place. These rejection cases take about 5 days to resolve. In some cases, the problem comes from an error of the clerk or the sites engineer and the issue is resolved internally. In other cases, the problem is resolved when the supplier sends a revised invoice. This revised invoice is then approved (100% of cases) and forwarded to the financial department.

1. Model the above case study as-is processes in Business Process Model and Notation (BPMN) using Bizagi Process Modeler.

2. Categorize activities in the processes as described in question 1 into the following categories:

(a) Value-adding (VA).

(b) Business value-adding (BVA).

(c) Non-value-adding (NVA).

3. Calculate the cycle time efficiency of the "as is" process.

4. Identify at least three (3) issues in the processes as described in question 3. Analyze these issues using root cause analysis (why-why diagram or Fishbone) or Pareto analysis. If you find that there are more than three (3) issues, you can focus on the three (3) issues that have the highest impact. State any implied assumptions.

5. Propose a set of changes in the processes as described in question 4. Draw a BPMN model that incorporates your proposed changes for the processes using Bizagi Process Modeler.

Reference no: EM132968902

Questions Cloud

Challenging the injunction and undertaking negotiations : Given that First Midwestern sold the underlying drafts and all the associated risk, which party is responsible for challenging the injunction and undertaking ne
Determine the economic order quantity in dozens : The administrative cost involved in handling each purchase order is P100. Determine the Economic Order (EOQ) Quantity in dozens
Compare examples of executive information system : Review and compare TWO examples of Executive Information System (EIS), which cover the features or functions available in the systems. Support your discussion w
What amount of rental revenue should be reported : The lease expires on January 1, 2022. The annual rental is P1,150,000. What amount of rental revenue should be reported
Calculate the cycle time efficiency of the as is process : Five working days after the plant is picked up, the plant's supplier sends an invoice to the clerk by e-mail. After checking that the engagement corresponding t
Calculate both the operating and cash cycles : Discuss your results above. Any concerns? Calculate both the operating and cash cycles. Cost of Goods Sold $55,000, Credit Sales $130,000.
Digital forensics in social media : Data Acquisition, Data Analysis and Data Validation - Record, administer and document digital forensics in social media - Explain the importance of a chain
What is 10-year vision for career : What is your 10-year vision for your career? What challenges/ Problems do you need to solve to accomplish that? Are you working on any of those now?
What are the functions hris type of application : What are the functions each HRIS type of application provides, as related to Hello Technology! Corporation's HR roles and responsibilities?

Reviews

Write a Review

Business Management Questions & Answers

  Caselet on michael porter’s value chain management

The assignment in management is a two part assignment dealing 1.Theory of function of management. 2. Operations and Controlling.

  Mountain man brewing company

Mountain Man Brewing, a family owned business where Chris Prangel, the son of the president joins. Due to increase in the preference for light beer drinkers, Chris Prangel wants to introduce light beer version in Mountain Man. An analysis into the la..

  Mountain man brewing company

Mountain Man Brewing, a family owned business where Chris Prangel, the son of the president joins. An analysis into the launch of Mountain Man Light over the present Mountain Man Lager.

  Analysis of the case using the doing ethics technique

Analysis of the case using the Doing Ethics Technique (DET). Analysis of the ethical issue(s) from the perspective of an ICT professional, using the ACS Code of  Conduct and properly relating clauses from the ACS Code of Conduct to the ethical issue.

  Affiliations and partnerships

Affiliations and partnerships are frequently used to reach a larger local audience? Which options stand to avail for the Hotel manager and what problems do these pose.

  Innovation-friendly regulations

What influence (if any) can organizations exercise to encourage ‘innovation-friendly' regulations?

  Effect of regional and corporate cultural issues

Present your findings as a group powerpoint with an audio file. In addition individually write up your own conclusions as to the effects of regional cultural issues on the corporate organisational culture of this multinational company as it conducts ..

  Structure of business plan

This assignment shows a structure of business plan. The task is to write a business plane about a Diet Shop.

  Identify the purposes of different types of organisations

Identify the purposes of different types of organisations.

  Entrepreneur case study for analysis

Entrepreneur Case Study for Analysis. Analyze Robin Wolaner's suitability to be an entrepreneur

  Forecasting and business analysis

This problem requires you to apply your cross-sectional analysis skills to a real cross-sectional data set with the goal of answering a specific research question.

  Educational instructional leadership

Prepare a major handout on the key principles of instructional leadership

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd