Calculate the circulating load of cleaner tailings

Assignment Help Civil Engineering
Reference no: EM13562469

A froth flotation process is used to concentrate copper ore. It is a two stage process with a rougher stage followed by a cleaner stage. The cleaner tailings are returned to the rougher flotation. Both stages are non-reactive unit operations and both operate at steady-state. the analytical profile of the entire flotation circuit is:

The rougher flotation feed grade is 0.50%Cu

The rougher concentration grade is 11.9%Cu

The rougher tailings conain 0.10%Cu

The final cleaner concentrate grade is 33.0%Cu

The cleaner tailings contain 4.5%Cu

a. Calculate the overall copper recovery for this process.

b.Calculate the copper recovery inthe cleaner flotation operation.

c. assuming the flotation process treats 75 tons/hr of copper ore, calculate the circulating load (in tons/hr) of cleaner tailings that return to the rougher flotation under steady-state operation.

Reference no: EM13562469

Questions Cloud

Find what is the velocity of cars after they stick together : an car mass 1000kg is traveling east30m/s . it is hit by another car 2000kg whick was travelingnorthwest at 20m/s.the two cars stick together. what is the velocity of the cars after they stick together
Calculate the design rate of super elevation : A simple highway curve is planned to connect two horizontal tangents that intersect at sta. 2500+00.00 at an external angle of 52°.  For a design speed of 60 mi/h and a curve radius of about 1.25 times the minimum allowable
What is the probability in each year that a flood : The annual maximum series of flood magnitude in a river has a normal distribution with a mean of 6000 m^3/s and a standard deviation of 800 m^3/s
Determine the total delay maximum queue length and the time : Vehicles arrive at a tollbooth according to the function h(t)= 5.2-0.2t, where h(t)is in vehicles per minute and t is in minutes. The toll booth operator processes 3 vehicles per minute. Determine the total delay, maximum queue length, and the time i..
Calculate the circulating load of cleaner tailings : A froth flotation process is used to concentrate copper ore. It is a two stage process with a rougher stage followed by a cleaner stage. The cleaner tailings are returned to the rougher flotation. Both stages are non-reactive unit operations and both..
When is the rider going to reach the stopping point : If we apply a breaking system to a skateboard while the speed of the skateboard is 5Milies per hour, the rider average weights is 180bounds while his height is 170 cm
Calculate the diameter of the cable required : A steel cable is to support an elevator whose total (loaded)mass is not to exceed 3100kg. calculate the diameter of the cable required
What is the maximum queue length : There are 10 vehicles in a queue when an attendent opens a toll booth. Vehicles arrive at the booth at a rate of 4 vehicles per minute. The attendent opens the booth and improves the service rate over time following the function u(t)= 1.1 +0.3t, wher..
What is the power output in horsepower of an electric motor : A power of 1 horesepower is equivalent to 746 W. What is the power output in horsepower of an electric motor that draws acurrent of 4 A at 120 V and is 80 percent efficient

Reviews

Write a Review

Civil Engineering Questions & Answers

  Determine the safe load the column can carry using working

A column of dimensions 200 X 300 mm has an effective length of 3m. It is reinforced with 6 HYSD bars of 20mm diameter. Determine the safe load the column can carry using working method of design. Using M20 Concrete.

  What is the distance-corrected for temperatures

A survey distance of 369.98 ft was recorded when the field temperatures was 100 degreesF. What is the distance, corrected for temperatures

  Estimate the size of a uniform horizontal welded-steel pipe

Estimate the size of a uniform, horizontal welded-steel pipe installed to carry 14.0 ft^3/sec of water 20 degreesC. The allowable pressure loss resulting from friction is 17ft/mi of pipe length.

  Expected boiling-point elevation

What is the expected boiling-point elevation of water for a solution that contains 271 g of sodium chloride dissolved in 1.0 kg of water?

  Estimate the factor of safety of the slope against sliding

Estimate the factor of safety of the slope against sliding. Use the table on page 2 as a design guide.

  Determine the total volume of the sandy silt

A 200,000 cubic m highway embankment is to be constructed at dry density of 1.85 Mg/m^3 and optimum moisture content of 16% by compacting sandy silt taken from a borrow pit. The in-situ bulk density of the sandy silt is 1.92 Mg/m^3 and its average wa..

  Calculate the critical radius and the number of atoms

Calculate the critical radius and the number of atoms in the nucleus of the homogeneous nucleation in GERMANIUM. The latent heat of fusion is 8100 cal per g-mile (atom) and the coefficient of linear expansion is 5.75*10^-6 per K

  What can you conclude about the work load for this worker

A relatively unfit worker with resting heart rate of 80 beats/min starts his job of palletizing boxes. At the morning break, an industrial engineer quickly measures the worker’s

  Determine the value of the dynamic viscosity at conditions

Start from the values for the density and the kinematic viscosity of CO2 at 15o C and standard atmospheric pressure (101.3 kPa), and first determine the value of the dynamic viscosity at the same conditions.

  Determine how much money the home owner would have saved

A house that was heated by electric resistance heaters consumed 1200 kWh of electric energy in a winter month. If this house were heated by a heat pump that has an average COP of 2.4, determine how much money the home owner would have saved that mont..

  What is the length of the core in inches if the diameter is

If the porosity of a core sample is 26 percent, the pore volume is7.7 cc, what is the length of the core in inchesif the diameter is 1.5 inches?

  What investment can be justified for the new surface

Annual maintenance cost for a particular section of highway pavement are $2000. The placement of a new surface would reduce the annual maintenance cost to $500 per year for the first 5 years and to $1000 per year for the next 5 years. After 10 years ..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd