A culvert is to be constructed in a bed of sand (e = 0.5) for drainage purposes. The foof of the culvert will be located 3 m below ground surface. Currently the groundwater level is at ground surface. But, after installation of the culvert, the groundwater level is expected to drop 2 m below ground surface. Calculated the change in vertical effective sress on the roof of the culvert after installation. You can assume the sand above the groundwater level is saturated.
The Fluoride feeder runs out of feed solution. The rapid mix tank is connected to a 5 km long distribution pipe. The flow rate into the tank mix tank is 0.44 m/s and the volume of the tank is 2.50 m.
Create 3 user defined functions to use in the script. function "flip" simulates the flip of one coin with the state "s" of the random number generator as the input argument, and the nes state "s" and the result of the flip (0 for a tail and 1 for ..
Assume frictionless flow in a long, horizontal, conical pipe. The diameter is 12 inches at one end and 6 inches at the other. The pressure head at the smaller end is 16 feet of water.
The base engine develops 200 ft-lb of torque, and a modified version of the engine develops 240 ft-lb of torque. If the overall gear reduction ratio is 8 to 1, what is the maximum acceleration from rest (in ft/sec^2) for:
Write a program that asks for the diameter of two different spheres. Then display to the user, the Maximum, Minimum, and Average volume of the spheres. Display this result in different lines of ONE message box by using VBCRLF.
determine the value of Po, as a funciton of H, for these two investment alternatives to be equivalent at an interest rate of i=15% per year.
Design a riveted end plated Connection between a beam ISHB-300 and the flange of the Column ISHB-200 to transfer a vertical factored shear of 125 kN and a factored hogging bending moment of 125kNm.Use Shop rivets of 20mm dia.
A cylindrical rod of brass alloy (E = 100 GPa,) having a yield strength of 345 MPa is to be subjected to a load of 7500 N. If the length and diameter of the rod are 338 mm and 7.55 mm respectively, what must be the allowable elongation
A clean-earth trapezoidal channel with a bottom width of 1.8 m and a side surface slope 1:1 is to drain water uniformly at a rate of 8 m^3/s to a distance ok 1 km. If the flow depth is not to exceed 1.2 m,
The receiver's velocity is constant at 10 yd/sec, and he catches passes when the ball is 6 ft. above the ground. If the quarterback desires the receiver to catch the ball 2.5 sec. after the launch instant, determine the initial speed v0 and angle,..
The elastic modulus is 40 GPa, the yield stress is 150 MPa, the ultimate stress is 525 MPa, and the ultimate strain is 0.38 (mm/mm). Perform the following tasks for this material. compute the tangent modulus between yield stress and ultimate stres..
A concrete building has floor area 10 m by 20 m and is 4 m high. THe building has four windows with a height 1.6 m and a width 2 m. After 10 minutes gases in the room have an average temperature of 700 degree Celcius.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd