Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Beck Manufacturing Al Beck, president of Beck manufacturing, wants to determine the capacity of his facil- ity, which produces steering gears for auto manufacturers. He has asked you to sort through the data and determine the capacity of the system and how that capacity may be increased. The operation is a product layout that produces large numbers of nearly iden- tical products. The process includes milling, grinding, boring, drilling, and assembling, in that order. Each finished product requires one operation on each type of machine. For example, each finished part is processed on one of the five milling machines, one of the seven grinding machines, etc.The facility runs two 8-hour shifts per day, with a third shift for maintenance. The indus- trial engineering department has provided you with the following data on present opera- tions. In addition, you have been told that assembly operations, while not unlimited, can be easily changed to meet the need.Operations Number of Machines run time per pieceMilling 5 2Grinding 7 3Boring 3 1Drilling 6 2.5Calculate the capacity of each machine center and the capacity of the system.Analyze where the focus of the company's efforts should be if Beck wants to expand capacity. Determine how much extra capacity he can get without causing another operation to become the bottleneck.Suggest ways Beck can expand capacity without purchasing new equipment.
The manager has assigned an annual carrying cost of 35% of the purchase price per crate. Ordering costs are $28. Currently the manager orders once per month.If the order lead-time is two weeks (ie 0.5 month) what is the re-order point?
Formulate the linear programming (LP) model for this problem by stating the decision variables, writing the objective function, and all the relevant constraints.
Compare the supply chain practices of 2 or more different companies in the same industry or similar industries. Should one industry adopt another's superior practices, or are their situations sufficiently different which everyone is already optimi..
A software development project at day 70 exhibits an actual cost of $78,000 also a scheduled cost of $84,000. Software manager estimates a value completed of $81,000. Illustrate what are cost also schedule variances also CSI. Estimate time varianc..
Solve the problem by rolling back the decision tree. In the second gamble, you have a 40% chance of receiving $80, a 40% chance of receiving $60 also a 20% chance of receiving $50. Draw a decision tree to represent the problem. Solve the problem b..
To minimize total cost, explain how many units should be ordered each time an order is placed. If the holding cost per unit was $6 instead of $5, illustrate what would the optimal order quantity be.
Give at least one example of how HR management concepts and techniques can be of use to all managers.
The relationship between the organization and its suppliers or its customers is key in making decisions regarding locating a plant or facility. Such decisions are generally a strategic decision.
What are the positive and negative impact of tariffs. Give a specific example of each. What are at least three factors that would motivate a company to set up a foreign operation.
Illustrate what is the possible short- also long-term effectiveness of diverse groups. Illustrate what demographic characteristics find out the way groups interact with each other.
This often involves creating a statement of work. You need to hire some financial auditors to help with the annual audit. Create a statement of work for these auditors which meets the subsequent criteria. Discuss why you chose to include which cont..
Discuss the various methods by which job analysis can be completed. Compare and contrast these methods, noting the pros and cons of each.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd