Calculate the additional working capital requirement

Assignment Help Corporate Finance
Reference no: EM13181809

A company is currently operating at 75% of its capacity producing 60,000 units during the year 2009 at the following cost price structure:




Raw Materials per unit


5.00

Wages per unit


4.00

Overheads per unit:



Variable

2.00


Fixed

2.00

4.00

Profit per unit


2.00

Selling Price per unit


15.00

On 31 December 2009, the company has the following Current Assets and liabilities:



Stock of Raw Materials - 10,000 units at cost

50,000

Stock of WIP - 5,000 units at cost

45,000

Stock of Finished Goods - 15,000 units at cost

1,95,000

Sundry Debtors

1,50,000

Sundry Creditors

50,000

Liability for Wages

20,000

Liability for Overheads

10,000

In view of the increased demand for the product, it has been decided to operate at 90% capacity on and from 01 January 2010 at the same cost price structure, period of block and selling price of 2009.

Calculate the additional Working Capital Requirement for the year 2010.

Reference no: EM13181809

Questions Cloud

Find b for the equation of the least-squares line : It is thought that prehistoric Indians did not take their best tools, pottery, and household items when they visited higher elevations for their summer camps.
Explain available electrons and needed electrons : For oxygen difluoride, OF 2 give the following information: a.) Available Electrons (AE) b.) Needed Electrons (NE) c.) Geometry Description d.) Number of sigma bonds
Calculate the additional working capital requirement : Calculate the additional Working Capital Requirement in the year 2010 - In the year 2010, the company wishes to operate at 80% of its capacity at the same Cost Price structure and selling price of 2009.
State engineering team is studying the effect of temperature : To prevent tank rupture during deep-space travel, an engineering team is studying the effect of temperature on gases confined to small volumes. What is the pressure of 3.40mol of gas D measured at 251 C in a 1.75-
Calculate the additional working capital requirement : Calculate the additional Working Capital Requirement for the year 2010 and it has been decided to operate at 90% capacity on and from 01 January 2010 at the same cost price structure, period of block and selling price of 2009.
Explain what will be the final temperature of the system : what will be the final temperature of the system when thermal equilibrium is attained
What is the annual compounding interest charged : What is the annual compounding interest charged? Using the compounding annual interest rate from above, what is the nominal, period interest rate and corresponding effective interest rate if compounding is hourly? Assume 30 days per month.
Describe the best situation to use each method : Describe the best situation to use each method. provide an example that uses either the substitution or elimination method to solve two linear equations.State which method classmates should use to solve the system.
What is expenditure multiplier : Marginal propensity: 0.63 - 0.76 what is expenditure multiplier? wil increase from __ to _____ and if multiplier increases, everything else equal. changein expend. will raise aggreg. ependiture to a [larger,smaller,same] amount

Reviews

Write a Review

Corporate Finance Questions & Answers

  Prepare a new cardiac surgery program

Ted Jones, the Surgery Unit Director, is about to choose his strategy for creating a capital expenditure funding proposal for the coming year.

  Determine the interest expense

Determine the interest expense that Coley Co. will show with respect to these bonds in its income statement for the fiscal year ended September 30, 2009, assuming that the discount of $360,000 is amortized on a straight-line basis.

  Define generally accepted accounting principles or standards

If you had to describe or define generally accepted accounting principles or standards, what essential characteristics would you include in your explanation?

  Explain why the issuing corporation charged

On March 31, 2011, Gardner Corporation received authorization to issue $50,000 of 9 percent, 30-year bonds payable. The bonds pay interest on March 31 and September 30. The entire issue was dated March 31, 2011, but the bonds were not issued until..

  Principles and tools for financial decision-making

Principles and tools for financial decision-making. Analyse the concept of corporate capital structure and compute cost of capital.

  Finding additional financing

ICU has current assets of $800,000 and net fixed assets of $1,400,000. The company expects its sales to climb 25% next year from its current level of $3,500,000.

  Selecting the best alternative

The R. Morin Construction Corporation requires to borrow $100,000 to help finance cost of a new $150,000 hydraulic crane used in firm's commercial construction business.

  Calculating expected return and standard deviation

You are planning the three securities listed below. Determine the expected return for each security and also find the standard deviation of returns for each security.

  Find the profit at the time of sale

Bay, Corporation buys a new machine for $50,000 on March 28, 2004. The useful life was expected to be 8-years & then they would sell it to junk yard for $2,000.

  Prepare a country risk analysis

Prepare a country risk analysis to evaluate if senior management at MNC should support the proposal for the company to enter the market in India with a major presence.

  Find projected profit under the guarantee deal

You have decided to become a rock concert promoter & have made arrangements with Jerry Jones to rent the new Texas Stadium for one night for a cost of dollar 1,000,000 plus a dollar 7 each ticket participation fees.

  Calculate the expected npv & coefficient of variation

Trail Guides, Corporation, is currently evaluating 2 mutually exclusive investment. After doing a scenario analysis & applying probabilities to every scenario;

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd