Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Calculate the additional stress (as a function of depth) that a temporary construction wall , like that shown in Figure As 1, must take as the result of a crane sustained in the zone above it.
A normally consolidated clay layer is 4 m thick (one way drainage). From the application of a given pressure, the total anticipated primary consolidation settlement will be 80mm. What is the average degree of consolidation for the clay layer.
A 100 ft steel tape known to be only 99.97ft long (understandard conditions) was used to record a measurem,ent of 215.63ft. What is the distance corrected for the erroneous tapelength
The minimum clearance between the roadway and the waterline must be 6 feet. The PVI is located at station 19+00.00 with elevation 420.50 feet. The design speed of the curve is 55 mph, g1 is +3%, and g2 is -3.0%. PRT= 2.5 sec, 0.35 = friction facto..
What is the vapor pressure of carbon dioxide in the bottle before it is opened (i.e., when it is at equilibrium) assuming no other ions are present besides those related to CO2 and water
What are the two principle factors influencing the allowable bearing pressure in the design of a specific footing- Are both of these factors equally important? Are both factors likely to be equally relevant for different soils types
The discharge through a 6.0 ft wide rectangular channel is 200.0 ft3/s. Find the conjugate depths of the jump formed in such a channel if 3.5 ft of energy head is lost through it.
A sand is densified by compaction at a construction site so thatthe void ratio changes from 0.8 to 0.5. If the specific gravity ofthe soil solids is 2.7, what is the increase in the dry unit weight of the sand
Each month the speedy dry Cleaning company buys 1 barrel (0.160 m^3)of dry cleaning fluid . Ninety percent of the fluid is lost to the atmosphere and 10 percent remains as residue to be disposed of.
Two reservoirs are connected with a 30" diameter pipe with a length of 19,680 ft. The water surface elevation in the upper reservoir of the upper reservoir is 984 ft, lower reservoir 886 ft and the elevation at the midpoint is 918 ft.
a simple curve has a central angle of 42degreess. a point y is located 24m from the vertex and has a perpendicular
the block is fitted between the fixed supports. if the glued joint can resist a maximum shear stress of T(allow)=2ksi, determine the temperature rise that will cause the joint to fail. Take E= 10(10^3)ksi, v=0.2
A 600 MW power plant has an efficiency of 36 percent with 15 percent of the waste heat being released to the atmosphere as stack heat and the other 85 percent taken away in the cooling water.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd